Madison, WI Header
File #: 74996    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in 2149 Rimrock Road, Private Contract No. 8167.
Type: Resolution Status: Passed
File created: 12/1/2022 In control: Engineering Division
On agenda: 1/3/2023 Final action: 1/3/2023
Enactment date: 1/6/2023 Enactment #: RES-23-00007
Title: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in 2149 Rimrock Road, Private Contract No. 8167. (14th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. Sanitary Schedule A Total Cost.pdf, 2. Storm pipe Schedule A Total Cost.pdf, 3. Storm structure Schedule A Total Cost.pdf, 4. Street Schedule A excluding bituminous.pdf, 5. Street Schedule A sidewalk.pdf

Fiscal Note

Private Contract, No City Funds Are Required.

Title

Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in  2149 Rimrock Road, Private Contract No. 8167. (14th AD)

Body

WHEREAS, Madison Rimrock Lodging Investors I, LLC has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, for a project enttitled 2149 Rimrock Road

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted. 

 

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service". 

 

SANITARY SEWER ACCOUNTING DATA

 

A)                     Total Contract Value (including Engineering

                     And Miscellaneous Costs)                                                               $                     5,600.00                     

 

B)                     Contributions in Aid of Construction:

                     a)                     Public Sewer Components                                          $                     5,600.00                     

                     b)                     Sewer Laterals                                                                                    $                     -0-                                          

 

C)                     Investments in Capital (MSU Share)                                          $                     -0-                                          

 

D)                     Total Plant Value                                                                                    $                     5,600.00                     

 

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service". 

 

 

Increase in Total Plant Value per Schedule “A”                     $42,710.80.

 

 

4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:

 

                     Rimrock Road from W Beltline HWY to Badger Rd

 

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 11919  $ 34,293.28 for a useful life of 40 years.