Madison, WI Header
File #: 61298    Version: 1 Name: Approving roadway geometry for the Cedar Street and South Park Street intersection improvements
Type: Resolution Status: Passed
File created: 7/8/2020 In control: Engineering Division
On agenda: 11/17/2020 Final action: 11/17/2020
Enactment date: 11/24/2020 Enactment #: RES-20-00748
Title: Approving roadway geometry for the Cedar Street and South Park Street intersection improvements. (13th AD)
Sponsors: Tag Evers, Sheri Carter
Attachments: 1. 11866TE-Geometrics_CrossingOptions.pdf, 2. 11866TE-Geometrics_CrossingOption4.pdf, 3. ITEM 7 Resolution 61298.pdf, 4. ITEM 7 Resolution 61298 - Cedar -Park intersection.pdf, 5. ITEM 7 Cedar Street.pdf, 6. ITEM 7 Agenda item 61298.pdf, 7. ITEM 7 Proposed Cedar street access change.pdf, 8. ITEM 7 Truman Olson Site_Configuration of the Park, Cedar, Beld Intersection A.pdf, 9. ITEM 7 Truman Olson Site_Configuration of the Park, Cedar, Beld Intersection B.pdf, 10. ITEM 7 (61298) and Item 13 (60869).pdf, 11. ITEM 7 and ITEM 13 Re_ Problem with on-line registration for Transportation Commission meeting.pdf, 12. ITEM 7 and ITEM 13 Cedar Street - South Madison.pdf, 13. ITEM 7 Opposed to Option 4 on Cedar St.pdf, 14. Public Comment-Registrants Report ITEM 7_Redacted.pdf, 15. Cedar Beld Park and New Cedar 8-19-2020.pdf, 16. 10 27 2020 PIM Cedar St_S Park Options.pdf, 17. Approved Final Geometry for Cedar St_S Park (option 4).pdf, 18. Public Comment-Registrants Report ITEM 5_Redacted.pdf

Fiscal Note

No appropriation required.

Title

Approving roadway geometry for the Cedar Street and South Park Street intersection improvements. (13th AD)

Body

The intersection of Cedar Street/South Park Street will be reconfigured to improve pedestrian and bicycle crossing movements because of the new Cedar Street connection to Fish Hatchery Road.

 

One public informational meeting was held to present designs and obtain public input.

 

NOW THEREFORE BE IT RESOLVED that the roadway geometry for the construction of Cedar Street and South Park Street intersection improvements is hereby approved and,

 

BE IT FURTHER RESOLVED that City Engineering and City Traffic Engineering are hereby authorized to proceed with final design for the project.