Madison, WI Header
File #: 75549    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in Sugar Maple - Phase 2, Private Contract No. 2380.
Type: Resolution Status: Passed
File created: 1/11/2023 In control: Engineering Division
On agenda: 2/7/2023 Final action: 2/7/2023
Enactment date: 2/10/2023 Enactment #: RES-23-00089
Title: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in Sugar Maple - Phase 2, Private Contract No. 2380. (1st AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2380 Street excluding bituminous Schedule A.pdf, 2. 2380 Street sidewalk Schedule A.pdf, 3. Sanitary Pipe Schedule A.pdf, 4. Sanitary structure Schedule A.pdf, 5. Storm pipe Schedule A.pdf, 6. Storm structure Schedule A.pdf
Fiscal Note
Private Contract, No City Funds Are Required.
Title
Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in Sugar Maple - Phase 2, Private Contract No. 2380. (1st AD)
Body
WHEREAS, Sugar Maple Lane, LLC has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Sugar Maple - Phase 2


NOW, THEREFORE, BE IT RESOLVED

1. That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted.

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".

SANITARY SEWER ACCOUNTING DATA

A) Total Contract Value (including Engineering
And Miscellaneous Costs) $ 37,266.49

B) Contributions in Aid of Construction:
a) Public Sewer Components $ 37,266.49
b) Sewer Laterals $ -0-

C) Investments in Capital (MSU Share) $ -0-

D) Total Plant Value $ 37,266.49

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".

Increase in Total Plant Value per Schedule “A” $4,541.60.

4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:
· Cherry Blossom Drive from the north line of Lot 42 to the north line of Lot 45.

The attached Schedule "A" representing th...