File #: 50128    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private contract in Edgewater Redevelopment, Private Contract No. 2241.
Type: Resolution Status: Passed
File created: 1/10/2018 In control: BOARD OF PUBLIC WORKS
On agenda: 2/6/2018 Final action: 2/6/2018
Enactment date: 2/12/2018 Enactment #: RES-18-00112
Title: Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private contract in Edgewater Redevelopment, Private Contract No. 2241.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 53B2241-Sanitary Schedule A Total Cost.pdf, 2. 53B2241-Storm Schedule A Total Cost.pdf, 3. 2241 complete Schedule A1.pdf, 4. 2241 complete Schedule A2.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
2/6/20181 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
1/17/20181 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
1/10/20181 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

Private Contract, No Appropriation Required.

Title

Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private contract in Edgewater Redevelopment, Private Contract No. 2241.

Body

WHEREAS, the Edgewater Hotel Company, LLC has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  Edgewater Redevelopment.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) be and are hereby accepted. 

 

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service". 

 

SANITARY SEWER ACCOUNTING DATA

 

A)                     Total Contract Value (including Engineering

                     and Miscellaneous Costs)                                                               $                     19,800.00                     

 

B)                     Contributions in Aid of Construction:

                     a)                     Public Sewer Components                                          $                     19,800.00                     

                     b)                     Sewer Laterals                                                                                    $                     -0-                                          

 

C)                     Investments in Capital (MSU Share)                                          $                     -0-                                          

 

D)                     Total Plant Value                                                                                    $                     19,800.00                     

 

 

 

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service". 

 

 

Increase in Total Plant Value per Schedule “A”                     $83,600.00.

 

 

4. That the street improvements, including the bituminous pavement, on the following streets be and are hereby accepted:

 

 

                     Langdon Street from 65 ft southwest of Wisconsin Ave to  63 ft northeast of Wisconsin Ave.

                     Wisconsin Ave from Langdon St to 125 ft southeast of Langdon St.

 

 

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 10076  $ 47,435.60 for a useful life of 40 years.