File #: 76845    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Eagle Trace - Phase 3, Private Contract No. 9394.
Type: Resolution Status: Passed
File created: 3/14/2023 In control: Engineering Division
On agenda: 4/18/2023 Final action: 4/18/2023
Enactment date: 4/19/2023 Enactment #: RES-23-00300
Title: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Eagle Trace - Phase 3, Private Contract No. 9394. (9th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 9394 Phase 3B Street Schedule A excluding bituminous UPDATED Dec2021.pdf, 2. 9394 Phase 3A Street Schedule A excluding bituminous UPDATED Dec2021.pdf, 3. 9394 Eagle Trace Ph 3a 3b & 3c Storm Schedule A Unit Cost UPDATED Dec2021.pdf, 4. 9394 Eagle Trace Ph 3a 3b & 3c Sanitary Schedule A Unit Cost UPDATED Dec2021.pdf

Fiscal Note

No City Funds required. Private contract.

Title

Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Eagle Trace - Phase 3, Private Contract No. 9394. (9th AD)

Body

WHEREAS, VHET LLC, has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  Eagle Trace - Phase 3.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted. 

 

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service". 

 

SANITARY SEWER ACCOUNTING DATA

 

A)                     Total Contract Value (including Engineering

                     and Miscellaneous Costs)                                                               $                     208,234.46                     

 

B)                     Contributions in Aid of Construction:

                     a)                     Public Sewer Components                                          $                     208,234.46                     

                     b)                     Sewer Laterals                                                               $                     ____-0-                     

 

C)                     Investments in Capital (MSU Share)                     $                     ____-0-                     

 

D)                     Total Plant Value                                                                                    $                     208,234.46                     

 

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service". 

 

Increase in Total Plant Value per Schedule “A”                     $221,671.16.

 

4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:

 

Phase 3A

 

                     Sister Oak Drive from the West line of Lot 80 to Lush Woods Trail

                     Sister Oak Trail from Lush Woods Trail to the East line of Lot 69

                     Lush Woods Trail from the West line of Lot 80 to the South line of Lot 98

 

Phase 3B

 

                     White Fox Lane from Pioneer Road to Clear Pond Way

                     White Fox Lane from Clear Pond Way to Windy Willow Road

                     White Fox Lane from Windy Willow Road to the East line of Lot 181

                     Windy Willow Road from the North line of Lot 190 to White Fox Lane

                     Windy Willow Road from White Fox Lane to the South line of Lot 219

                     Rustic Rise Way from the North line of Lot 202 to Hollow Aspen Lane

                     Rustic Rise Way from Hollow Aspen Lane to the South line of Lot 209

                     Hollow Aspen Lane from Rustic Rise Way to the East line of Lot 150

                     Pioneer Road from White Fox Lane to the South line of Lot 236

                     Pioneer Road from White Fox Lane to the North line of Lot 198

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 12167  $ 566,292.40 for a useful life of 40 years.