Fiscal Note
Private contract. No City funds are required.
Title
Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in Hawks Valley - Phase 1, Private Contract No. 2271 (1st AD)
Body
WHEREAS, Watermark JT, LLC has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Hawks Valley - Phase 1.
NOW, THEREFORE, BE IT RESOLVED
1. That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted.
2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".
SANITARY SEWER ACCOUNTING DATA
A) Total Contract Value (including Engineering
And Miscellaneous Costs) $ 192,412.00
B) Contributions in Aid of Construction:
a) Public Sewer Components $ 192,412.00
b) Sewer Laterals $ -0-
C) Investments in Capital (MSU Share) $ -0-
D) Total Plant Value $ 192,412.00
3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".
Increase in Total Plant Value per Schedule “A” $135,934.98
4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:
• Ashworth Drive from W Line of Lot 24 to Woods Road
• Swainson Drive From Ashworth Drive to Tiercel Drive
• Raptor Drive from S Line of Lot 31 to Tiercel Drive
• Tiercel Drive from W Line of Lot 43 to Swainson Drive
• Woods Road from Ashworth Drive to Mid Town Road
The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 10082 $266,071.25 for a useful life of 40 years.