Madison, WI Header
File #: 77836    Version: Name: Substitute - Authorizing Madison Water Utility to use Water Well Solutions, LLC as a sole source provider of a Lamnaflo device and its installation in Unit Well 14, a water supply well.
Type: Resolution Status: Passed
File created: 5/10/2023 In control: FINANCE COMMITTEE
On agenda: 6/6/2023 Final action: 6/6/2023
Enactment date: 6/12/2023 Enactment #: RES-23-00423
Title: Substitute: Authorizing Madison Water Utility to use Water Well Solutions, LLC as a sole source provider of a Lamnaflo device and its installation in Unit Well 14, a water supply well.
Sponsors: Charles Myadze, Amani Latimer Burris
Attachments: 1. Resolution 77836 - Original Version.pdf, 2. Item 3 - Attachment - Water Well Solutions - Non-Competitive Selection Request - CC Approval Required April 2023.pdf
Fiscal Note
The proposed resolution authorizes a sole source agreement for purchase of a Lamnaflo flow control system and its installation at Unit Well 14. The estimated cost is $105,000. Funding is available in Munis 11900-86-140. No additional appropriation is required.

Title
Substitute: Authorizing Madison Water Utility to use Water Well Solutions, LLC as a sole source provider of a Lamnaflo device and its installation in Unit Well 14, a water supply well.

Body
WHEREAS, Madison Water Utility completed an initial phase of a water quality/borehole characterization study
at Unit Well 14 which determined that the well draws the majority of its water from the shallower, upper aquifer
compared to the deeper, lower aquifer, resulting in elevated sodium and chloride levels; and

WHEREAS, in 2022 the Utility, working with SCS Engineers, under non-pumping conditions, completed
additional water sampling within the borehole at depths representing the deeper, lower aquifer, which upon
testing, demonstrated that the lower aquifer water had lower concentrations of sodium and chloride; and

WHEREAS, the Utility continued this investigation in 2023 by hiring a licensed municipal well driller to
rehabilitate the borehole both chemically and mechanically and then sample the well at lower aquifer depths
again but under “pumping” conditions, which required special down hole sampling equipment; and

WHEREAS, it was consequently determined that sodium and chloride levels at this well can be reduced
significantly by drawing more of its water from the lower aquifer and less from the upper aquifer utilizing a flow
control system in the well; and

WHEREAS, Water Well Solutions Wisconsin LLC is the only vendor that can provide and install the specific flow
control system (Lamnaflo) deemed necessary in increasing/decreasing flow at preferable levels within a well,
thus reducing the sodium and chloride levels in its Unit Well 14;

NOW, THEREFORE, BE IT RESOLVED, that the Common C...

Click here for full text