Madison, WI Header
File #: 77152    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Birchwood Point South - Phase 3, Private Contract No. 8550.
Type: Resolution Status: Passed
File created: 4/6/2023 In control: Engineering Division
On agenda: 5/2/2023 Final action: 5/2/2023
Enactment date: 5/8/2023 Enactment #: RES-23-00353
Title: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Birchwood Point South - Phase 3, Private Contract No. 8550 (1st AD).
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 8550 Birchwood Pt South Ph 3 Sanitary Schedule A Unit Cost.pdf, 2. 8550 Birchwood Pt South Ph 3 Storm Schedule A Unit Cost UPDATED Dec2021.pdf, 3. 8550 Street Schedule A excluding bituminous UPDATED Dec2021.pdf
Fiscal Note
No City Funds required. Private contract.
Title
Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Birchwood Point South - Phase 3, Private Contract No. 8550 (1st AD).
Body
WHEREAS, VH Birchwood South, LLC, has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Birchwood Point South - Phase 3.


NOW, THEREFORE, BE IT RESOLVED

1. That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted.

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".

SANITARY SEWER ACCOUNTING DATA

A) Total Contract Value (including Engineering
and Miscellaneous Costs) $ 63,958.90

B) Contributions in Aid of Construction:
a) Public Sewer Components $ 63,958.90
b) Sewer Laterals $ ____-0-

C) Investments in Capital (MSU Share) $ ____-0-

D) Total Plant Value $ 63,958.90

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".


Increase in Total Plant Value per Schedule “A” $123,387.60



4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:


· Hazy Sky Parkway from the West line of Lot 358 to Sugar Maple Lane
· Sugar Maple Lane from Ha...

Click here for full text