File #: 70324    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract In Hawks Woods Estates - Phase 1, Private Contract No. 2236.
Type: Resolution Status: Passed
File created: 3/1/2022 In control: Engineering Division
On agenda: 3/29/2022 Final action: 3/29/2022
Enactment date: 4/4/2022 Enactment #: RES-22-00213
Title: Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract In Hawks Woods Estates - Phase 1, Private Contract No. 2236. (1st AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2236 Sanitary Schedule A Unit Cost.pdf, 2. 2236 Storm Schedule A Unit Cost.pdf, 3. 2236 Street excluding bituminous Schedule A.pdf, 4. 2236 Streets Schedule A bituminous Schedule A.pdf

Fiscal Note

Private contract. No City funds required. 

Title

Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract In Hawks Woods Estates - Phase 1, Private Contract No. 2236. (1st AD)

Body

WHEREAS, the Hawks Woods Estates, LLC, has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  Hawks Woods Estates - Phase 1.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) be and are hereby accepted. 

 

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service". 

 

SANITARY SEWER ACCOUNTING DATA

 

A)                     Total Contract Value (including Engineering

                     and Miscellaneous Costs)                                                               $                     86,498.23                     

 

B)                     Contributions in Aid of Construction:

                     a)                     Public Sewer Components                                          $                     86,498.23                     

                     b)                     Sewer Laterals                                                                                    $                     -0-                                          

 

C)                     Investments in Capital (MSU Share)                                          $                     -0-                                          

 

D)                     Total Plant Value                                                                                    $                     86,498.23                     

 

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service". 

 

Increase in Total Plant Value per Schedule “A”                     $92,200.35.

 

4. That the street improvements, including the bituminous pavement, on the following streets be and are hereby accepted:

 

                     Ashworth Drive from W Line of Lot 1 to E Line of Lot 9

                     Hawkstone Way from N Line of Lot 6 to Ashworth Drive

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B2236  $84,621.06 for a useful life of 40 years.