Madison, WI Header
File #: 62815    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract In Paragon Place - Phase 2, Private Contract No. 8071
Type: Resolution Status: Passed
File created: 10/27/2020 In control: Engineering Division
On agenda: 11/17/2020 Final action: 11/17/2020
Enactment date: 11/24/2020 Enactment #: RES-20-00758
Title: Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract In Paragon Place - Phase 2, Private Contract No. 8071 (9th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 8071 Sanitary Schedule A Unit Cost.pdf, 2. 8071 Storm Schedule A.pdf, 3. 8071 Street Schedule A complete Schedule A.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
11/17/20201 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
11/4/20201 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
10/27/20201 Engineering Division Refer  Action details Meeting details Not available
Fiscal Note
Private contract. No City funds required.
Title
Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract In Paragon Place - Phase 2, Private Contract No. 8071 (9th AD)
Body
WHEREAS, the MCS Investments, Inc., has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Paragon Place - Phase 2.


NOW, THEREFORE, BE IT RESOLVED

1. That said sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) be and are hereby accepted.

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".

SANITARY SEWER ACCOUNTING DATA

A) Total Contract Value (including Engineering
and Miscellaneous Costs) $ 28,143.50

B) Contributions in Aid of Construction:
a) Public Sewer Components $ 28,143.50
b) Sewer Laterals $ -0-

C) Investments in Capital (MSU Share) $ -0-

D) Total Plant Value $ 28,143.50

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".


Increase in Total Plant Value per Schedule “A” $70,482.83.


4. That the street improvements, including the bituminous pavement, on the following streets be and are hereby accepted:


· Chaska Drive from 50’ N of Wilrich Street to Paragon Street
· Paragon Street from Chaska Drive to 220’ E of Chaska...

Click here for full text