Madison, WI Header
File #: 61920    Version: 1 Name: Determining a Public Purpose and Necessity and adopting Relocation Orders for the acquisitions of land interests required for the construction of improvements for the reconstruction of S. Blair Street and the S. Blair Street Intersection with John Nolen D
Type: Resolution Status: Passed
File created: 8/25/2020 In control: Engineering Division
On agenda: 10/6/2020 Final action: 10/6/2020
Enactment date: 10/13/2020 Enactment #: RES-20-00694
Title: Determining a Public Purpose and Necessity and adopting Relocation Orders for the acquisitions of land interests required for the construction of improvements for the reconstruction of S. Blair Street and the S. Blair Street Intersection with John Nolen Drive. Located in part of the SE ¼ of the SW ¼ (Government Lot 4) of Section 13, T7N, R9E, in the City of Madison. (2nd, 4th and 6th AD’s)
Sponsors: Patrick W. Heck, Michael E. Verveer
Attachments: 1. RW PROJECT NUMBER 5400-00-72.pdf, 2. RW PROJECT NUMBER 5400-00-73.pdf, 3. Vicinity Map Blair 11128 & 11135.pdf
Fiscal Note
Funding is included in the 2019 adopted capital budget and capital improvement plan (CIP) within the Engineering Major Streets-Blair/John Nolen Intersection and USH 151 (Blair St and E Washington St) projects. The land interest acquisition and relocation cost estimate, including City Real Estate staff time and related administration costs available in Account. No(s):

11128-402-170 Blair St South Pavement Replacement, ($110,000 Temporary Easement Acquisition)
11135-402-170 Blair St John Nolen Intersection, ($10,000 Temporary Easement Acquisition)
Title
Determining a Public Purpose and Necessity and adopting Relocation Orders for the acquisitions of land interests required for the construction of improvements for the reconstruction of S. Blair Street and the S. Blair Street Intersection with John Nolen Drive. Located in part of the SE ¼ of the SW ¼ (Government Lot 4) of Section 13, T7N, R9E, in the City of Madison. (2nd, 4th and 6th AD’s)
Body
Relocation Order of the City of Madison, Dane County, Wisconsin

WHEREAS, the City of Madison, in coordination with the Wisconsin Department of Transportation, is proposing to reconstruct USH 151 (S Blair St and E Washington Ave) from John Nolen Dr to E Washington Ave and to reconstruct the John Nolen Drive - S Blair St Intersection. The City applied for and received Highway Safety Improvement Program (HSIP) construction funding for the reconstruction of the John Nolen Drive - S Blair St Intersection. The City of Madison and State of Wisconsin Department of Transportation, using a combination of State and Local funds, are proposing a pavement replacement project on USH 151 (S Blair St and E Washington Ave) from John Nolen Dr to E Washington Ave and from S. Blair St. to S. Blount St.; and,

WHEREAS, the City of Madison Engineering Division has established Project Numbers, 11128 Blair St South Pavement Replacement and 11135 Blair St John Nolen Intersection, for the design and administration of the reconstruct...

Click here for full text