Madison, WI Header
File #: 60028    Version: 1 Name: Approving plans and specifications for public improvements necessary for the project known as Two Points Crossing CSM - Lot 4 Future Phase and authorizing construction to be undertaken by the Developer, Private Contract No. 8886
Type: Resolution Status: Passed
File created: 3/17/2020 In control: Engineering Division
On agenda: 3/31/2020 Final action: 3/31/2020
Enactment date: 4/3/2020 Enactment #: RES-20-00249
Title: Approving plans and specifications for public improvements necessary for the project known as Two Points Crossing CSM - Lot 4 Future Phase and authorizing construction to be undertaken by the Developer, Private Contract No. 8886 (9th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 8886 Location map and improvements.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
3/31/20201 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
3/25/20201 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
3/17/20201 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

Private contract. No City Funds required.

Title

Approving plans and specifications for public improvements necessary for the project known as Two Points Crossing CSM - Lot 4 Future Phase and authorizing construction to be undertaken by the Developer, Private Contract No. 8886 (9th AD)

Body

WHEREAS, the developer, Welton Family Limited Partnership, has received the City of Madison's conditional approval for a four lot Certified Survey Map (CSM) (three lots for a proposed development and one lot for future development) at Two Points Crossing (9301-9317 Mineral Point Road and 9450 Silicon Prairie Parkway), and,

 

WHEREAS, Section 16.23(9) of the Madison General Ordinances and the conditions of approval require the developer to install the public improvements necessary to serve the project.

 

NOW, THEREFORE, BE IT RESOLVED:

 

1.                     That the Mayor and City Clerk are hereby authorized and directed to execute a Future Phase Contract For the Construction of Public Improvements that will be accepted by the City of Madison For Two Points Crossing CSM - Lot 4 Future Phase, with Welton Family Limited Partnership.

 

2.                     That the developer is authorized to construct the public improvements in accordance with the terms of the Future Phase Contract For the Construction of Public Improvements That Will be Accepted by the City of Madison at the sole cost of the developer, except as follows: NONE

 

3.                     That the Mayor and City Clerk are hereby authorized to sign and grant easements or right-of-way release or                      procurement documents, maintenance agreements or encroachment agreements, as necessary and grant or accept                      dedication of lands and/or easements from/to the Developer/Owner for public improvements located outside of existing                      public fee title or easement right-of-ways.