File #: 58733    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract In Eighth Addition to Blackhawk Subdivision - Phase 9, Private Contract No. 7682.
Type: Resolution Status: Passed
File created: 12/16/2019 In control: BOARD OF PUBLIC WORKS
On agenda: 1/21/2020 Final action: 1/21/2020
Enactment date: 1/27/2020 Enactment #: RES-20-00044
Title: Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract In Eighth Addition to Blackhawk Subdivision - Phase 9, Private Contract No. 7682. (9th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 7682 Sanitary Schedule A Unit Cost.pdf, 2. 7682 Storm Schedule A Unit Cost.pdf, 3. 7682 Street Schedule A complete.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
1/21/20201 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
1/8/20201 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
12/16/20191 BOARD OF PUBLIC WORKS Refer  Action details Meeting details Not available
Fiscal Note
Private Contract, No City Funds Required.
Title
Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract In Eighth Addition to Blackhawk Subdivision - Phase 9, Private Contract No. 7682. (9th AD)
Body
WHEREAS, the McKenzie 300 Corporation, has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Eighth Addition to Blackhawk Subdivision - Phase 9


NOW, THEREFORE, BE IT RESOLVED

1. That said sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) are hereby accepted.

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".

SANITARY SEWER ACCOUNTING DATA

A) Total Contract Value (including Engineering
and Miscellaneous Costs) $ 41,342.40

B) Contributions in Aid of Construction:
a) Public Sewer Components $ 41,342.40
b) Sewer Laterals $ -0-

C) Investments in Capital (MSU Share) $ -0-

D) Total Plant Value $ 41,342.40

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".


Increase in Total Plant Value per Schedule “A” $94,900.30.


4. That the street improvements, including the bituminous pavement, on the following streets are hereby accepted:


· Big Stone Trail from Old Sauk Road to NW Line of Lot 490


The attach...