Fiscal Note
The proposed resolution authorizes allocation of funding up to $1,846,785 for architectural and engineering consulting services over the next five years for
Metro Transit Maintenance Facility
phased upgrades at 1101 E. Washington Avenue. Funding for 2020 is included in the Adopted 2020 Capital Budget (MUNIS Project 11229). Funding for 2021 and 2022 are in the Adopted 2020 Capital Improvement Plan. The consulting work will only be authorized to proceed by
phase.
Title
Authorizing the Mayor and City Clerk to enter into a competitively selected service contract with Mead and Hunt for architectural and engineering services for the
Metro Transit Maintenance Facility (1101 E. Washington Ave)
Phased Facility Upgrade. (6th AD)
Body
WHEREAS, City Engineering and Madison
Metro Transit require architectural and engineering (A/E) consulting services to complete the Schematic Design, Design Development, Construction Documentation, Bidding and Negotiation, Construction Administration and Warranty work for a
phased facility upgrade; and
WHEREAS, the anticipated work involves implementing recommendations from a facility study completed in 2018 including: a 2021 project for
Phase 3A - maintenance bay replacement, a 2022 project for
Phase 3B - administrative and support area remodel, and a 202
3 project for
Phase 3C - bus storage remodel; and
WHEREAS, City Engineering and Madison
Metro Transit worked with the Purchasing Division to issue RFP # 8846 to solicit proposals for such services, and received 5 proposals; and
WHEREAS, an evaluation team consisting of Purchasing and relevant Engineering and
Metro Transit staff conducted a detailed evaluation, scored and ranked each of the proposals using criteria including cost, skill, equipment, past performance, and references; interviewed finalists and Mead and Hunt was selected through this process; and
WHEREAS, to complete the consulting work, a five-year contract is required to perform the architectural, engi...
Click here for full text