Madison, WI Header
File #: 58743    Version: 1 Name: Authorizing the Mayor and City Clerk to enter into a 2-year, competitively selected service contract with Mead and Hunt for architectural and engineering services at the Metro Transit Maintenance Facility (1101 E. Washington Ave).
Type: Resolution Status: Passed
File created: 12/17/2019 In control: Engineering Division
On agenda: 1/21/2020 Final action: 1/21/2020
Enactment date: 1/27/2020 Enactment #: RES-20-00048
Title: Authorizing the Mayor and City Clerk to enter into a competitively selected service contract with Mead and Hunt for architectural and engineering services for the Metro Transit Maintenance Facility (1101 E. Washington Ave) Phased Facility Upgrade. (6th AD)
Sponsors: Tag Evers, Keith Furman
Attachments: 1. 8846 Evaluation Report.pdf

Fiscal Note

The proposed resolution authorizes allocation of funding up to $1,846,785 for architectural and engineering consulting services over the next five years for Metro Transit Maintenance Facility phased upgrades at 1101 E. Washington Avenue. Funding for 2020 is included in the Adopted 2020 Capital Budget (MUNIS Project 11229). Funding for 2021 and 2022 are in the Adopted 2020 Capital Improvement Plan. The consulting work will only be authorized to proceed by phase.

 

Title

Authorizing the Mayor and City Clerk to enter into a competitively selected service contract with Mead and Hunt for architectural and engineering services for the Metro Transit Maintenance Facility (1101 E. Washington Ave) Phased Facility Upgrade.  (6th AD)

Body

WHEREAS, City Engineering and Madison Metro Transit require architectural and engineering (A/E) consulting services to complete the Schematic Design, Design Development, Construction Documentation, Bidding and Negotiation, Construction Administration and Warranty work for a phased facility upgrade; and

 

WHEREAS, the anticipated work involves implementing recommendations from a facility study completed in 2018 including: a 2021 project for Phase 3A - maintenance bay replacement, a 2022 project for Phase 3B - administrative and support area remodel, and a 2023 project for Phase 3C - bus storage remodel; and

 

WHEREAS, City Engineering and Madison Metro Transit worked with the Purchasing Division to issue RFP # 8846 to solicit proposals for such services, and received 5 proposals; and 

 

WHEREAS, an evaluation team consisting of Purchasing and relevant Engineering and Metro Transit staff conducted a detailed evaluation, scored and ranked each of the proposals using criteria including cost, skill,  equipment, past performance, and references; interviewed finalists and Mead and Hunt was selected through this process; and 

 

WHEREAS, to complete the consulting work, a five-year contract is required to perform the architectural, engineering and all of the other deliverables required by RFP # 8846; and

 

WHEREAS,  under MGO 4.26(3)(e), service contracts of more than one year that average more than $100,000 per year in cost require Common Council approval and signature by the Mayor and City Clerk; 

 

NOW, THEREFORE, BE IT RESOLVED, that the Mayor and City Clerk are hereby authorized to execute a contract with Mead and Hunt for architectural and engineering services for the Metro Transit Maintenance Facility at 1101 E. Washington Ave.