File #: 55943    Version: 1 Name: Accepting storm sewer and street improvements (including bituminous surface pavement) constructed by Private Contract High Crossing Fifth Addition - Phase 5, and Rescinding RES-18-00323
Type: Resolution Status: Passed
File created: 5/15/2019 In control: Engineering Division
On agenda: 6/11/2019 Final action: 6/11/2019
Enactment date: 6/14/2019 Enactment #: RES-19-00441
Title: Accepting storm sewer and street improvements (including bituminous surface pavement) constructed by Private Contract High Crossing Fifth Addition - Phase 5, and Rescinding RES-18-00323 (17th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 7888 High Crossing 5th Add Street Complete Schedule A.pdf, 2. 7888 High Crossing 5th Add Storm Schedule A Unit Cost.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
6/11/20191 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
5/22/20191 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
5/15/20191 Engineering Division Refer  Action details Meeting details Not available
Fiscal Note
Private Contract. No City Appropriation Required.
Title
Accepting storm sewer and street improvements (including bituminous surface pavement) constructed by Private Contract High Crossing Fifth Addition - Phase 5, and Rescinding RES-18-00323 (17th AD)
Body
WHEREAS, the IA City View, LLC, has satisfactorily completed the installation of storm sewer and street improvements (including bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: High Crossing Fifth Addition - Phase 5; and,

WHEREAS, the storm sewer and street improvements (including bituminous surface pavement) were accepted on May 7, 2018 by Resolution RES-18-00323, File Number 51147; and,

WHEREAS, the contract number was incorrect on May 7, 2018 by Resolution RES-18-00323, File Number 51147; and,

WHEREAS, the correct contract number for High Crossing Fifth Addition - Phase 5 is Private Contract Number 7888.


NOW, THEREFORE, BE IT RESOLVED

1. That said storm sewer and street improvements (including bituminous surface pavement) be and are hereby accepted.

2. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".

Increase in Total Plant Value per Schedule “A” $111,492.65.


4. That the street improvements, including the bituminous pavement, on the following streets be and are hereby accepted:

· Crossroads Drive from City View Drive to north property line of Lot 3 (CSM 14540)
· City View Drive from 85’ south of Crossroads Drive to 250’ north of Crossroads Drive.


The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 11630 $185,030.92 ...