File #: 36252    Version: 1 Name: Accepting bituminous surface improvements constructed by Private Contract In The Meadowlands - Phase I, Private Contract No. 1966
Type: Resolution Status: Passed
File created: 11/17/2014 In control: BOARD OF PUBLIC WORKS
On agenda: 12/2/2014 Final action: 12/2/2014
Enactment date: 12/3/2014 Enactment #: RES-14-00902
Title: Accepting bituminous surface improvements constructed by Private Contract In The Meadowlands - Phase I, Private Contract No. 1966
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 1966 bituminous Schedule A.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
12/2/20141 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
11/19/20141 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
11/17/20141 Engineering Division Refer  Action details Meeting details Not available
Fiscal Note
Private Contract, No City Funds Are Required.
Title
Accepting bituminous surface improvements constructed by Private Contract In The Meadowlands - Phase I, Private Contract No. 1966
Body
WHEREAS, Meadowlands Land, LLC has satisfactorily completed the installation of bituminous surface improvements by private contract in accordance with the City of Madison Standard Specifications for Public Works Construction for: The Meadowlands - Phase I.
 
NOW, THEREFORE, BE IT RESOLVED
 
1. That the bituminous surface improvements on the following streets be and are hereby accepted:
 
·      Milwaukee Street from the west plat line (existing street) to the east line of Lot 221
·      Reston Heights Drive from Sta. 50+37.65 to the east line of Lot 219
·      Silver Dawn Drive from Wind Stone Drive to the east line of Lot 18
·      Littlemore Drive from east line of Lot 71 to Sta. 107+20.05
·      Golden Maple Road from Littlemore Drive to the north line of Lot 54
·      Wind Stone Drive from Littlemore Drive to Milwaukee Street
·      East Hill Parkway (northbound) from Littlemore Drive to Reston Heights Drive
·      Alley Outlot 1 from Golden Maple Road to the east line of Lot 74
·      Alley Outlot 10 from Wind Stone Drive to the east line of Lot 221
 
The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B1966  $ 99,692.51 for a useful life of 40 years.