Madison, WI Header
File #: 25916    Version: 1 Name: Madison Gas and Electric Company’s Customer Owned Parallel Generation Program
Type: Resolution Status: Passed
File created: 4/10/2012 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 5/1/2012 Final action: 5/1/2012
Enactment date: 5/2/2012 Enactment #: RES-12-00296
Title: Authorizing the City Engineer to apply to Madison Gas and Electric Company’s Customer Owned Parallel Generation Program, authorizing the Mayor and Clerk to sign a Distributed Generation Interconnection Agreement with MG&E, and authorizing indemnification of MG&E, for Photovoltaic Generation sites at Engineering Service Building at 1600 Emil St., Central Library at 201 W Mifflin St., and future City-owned installation sites.
Sponsors: Tim Bruer, Michael E. Verveer
Fiscal Note
Under this program, MG&E will credit or buy back the photovoltaic (PV)-generated power at the current customer rate. This rate will increase in future years, increasing revenue to the City. In 2012 revenue of $3,120 annually is estimated (Engineering Service Building only) and in 2013 revenue of $ 6,427 annually (inc. Central Library and engineering Service Building). These credits will reduce the net cost of electricity at each of the locations.

Title
Authorizing the City Engineer to apply to Madison Gas and Electric Company’s Customer Owned Parallel Generation Program, authorizing the Mayor and Clerk to sign a Distributed Generation Interconnection Agreement with MG&E, and authorizing indemnification of MG&E, for Photovoltaic Generation sites at Engineering Service Building at 1600 Emil St., Central Library at 201 W Mifflin St., and future City-owned installation sites.

Body
Whereas, Madison Gas and Electric Company (“MGE”) offers a Customer-owned Parallel Generation program under which a customer who generates electricity at their own renewable energy site receives a credit on their energy bill to offset the electricity consumed at the site; and

Whereas, the City is a customer of MGE and will install multiple solar photovoltaic generation (PVG) renewable energy installations and wishes to participate in the Customer-Owned Parallel Generation program; and

Whereas, the City has installed Photovoltaic systems in the past under a different MGE program, which has been discontinued and was replaced with this program applicable to new sites; and

Whereas, MGE requires the city to file a new application form PSC 6027 for each new installation site; and

Whereas, the City plans to install Photovoltaic Generation sites at the Engineering Service Building at 1600 Emil Street, the Central Library at 201 W Mifflin St., and plans for future City-owned installation sites; and

Whereas, the City is already under contract to remodel the Central Lib...

Click here for full text