Madison, WI Header
File #: 06997    Version: Name: SUBSTITUTE - Warner Park Stadium Renovation, Preliminary Pln, Soils Analysis and Cost Estimate Consultant
Type: Resolution Status: Passed
File created: 7/11/2007 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 9/4/2007 Final action: 9/4/2007
Enactment date: 9/7/2007 Enactment #: RES-07-00852
Title: SUBSTITUTE - To Amend the 2007 Parks Division Capital Budget to transfer $25,000 from account #810397 to cover the city's 50% share of the cost and to accept $25,000 for the balance of the cost from the Madison Mallards, LLC for the Warner Park Stadium Renovation; authorizing the issuance of a Request for Proposals for the development of a Preliminary Plan, Soils Analysis and Cost Estimate for a new Warner Park Stadium, and authorizing the Mayor and City Clerk to sign an agreement to secure the Plan.
Sponsors: David J. Cieslewicz, Satya V. Rhodes-Conway, Michael Schumacher
Attachments: 1. 06997 Registration Stmts.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
9/4/20072 COMMON COUNCIL AdoptPass Action details Meeting details Not available
8/27/20072 BOARD OF ESTIMATES (ended 4/2017) RECOMMEND TO COUNCIL TO ADOPT (15 VOTES REQUIRED) - REPORT OF OFFICERPass Action details Meeting details Not available
8/22/20072 Finance Dept/Approval Group Approved Fiscal Note By The Comptroller's Office (AFTER CC INTRO)  Action details Meeting details Not available
8/8/20072 BOARD OF PUBLIC WORKS Return to Lead with the Recommendation for ApprovalPass Action details Meeting details Not available
8/8/20072 BOARD OF PARK COMMISSIONERS Return to Lead with the Recommendation for ApprovalPass Action details Meeting details Not available
7/17/20072 COMMON COUNCIL Refer  Action details Meeting details Not available
7/17/20072 Council Office Referred for Introduction  Action details Meeting details Not available
7/17/20072 BOARD OF ESTIMATES (ended 4/2017) Refer  Action details Meeting details Not available
7/17/20072 BOARD OF ESTIMATES (ended 4/2017) Refer  Action details Meeting details Not available
7/17/20072 BOARD OF PUBLIC WORKS Fiscal Note Required / Approval  Action details Meeting details Not available
7/11/20071 Parks Division Fiscal Note Required / Approval  Action details Meeting details Not available
7/11/20071 Finance Dept/Approval Group Fiscal Note Pending  Action details Meeting details Not available
7/11/20071 Parks Division Referred for Introduction  Action details Meeting details Not available
Fiscal Note
This resolution would amend the 2007 Parks Division Capital Budget by the transfer of $25,000 from Project 6, Account 810397 "Parks Facility Improvements" to Project #15 "Warner Park Stadium". An additional $25,000 of funding is to be provided by the Madison Mallards, LLC, supporting total project costs of $50,000. No additional appropriation is necessary, nor is there any anticipated impact upon cost controls.
Title
SUBSTITUTE - To Amend the 2007 Parks Division Capital Budget to transfer $25,000 from account #810397 to cover the city's 50% share of the cost and to accept $25,000 for the balance of the cost from the Madison Mallards, LLC for the Warner Park Stadium Renovation; authorizing the issuance of a Request for Proposals for the development of a Preliminary Plan, Soils Analysis and Cost Estimate for a new Warner Park Stadium, and authorizing the Mayor and City Clerk to sign an agreement to secure the Plan.
Body
PREAMBLE

In spring 2006, the owners of Madison Mallards, LLC. Baseball submitted a proposal to the Mayor's office to enhance and renovate the Warner Park Baseball Stadium. The Mallards also hired an architectural and engineering consultant, and developed a design concept that included many elements: rotating the playing field 180 degrees; an innovative public address system; the addition of three buildings that would feature restrooms, concessions, and souvenirs; a Press Box, offices and Rooftop seating/hospitality areas; a more efficient parking lot design to increase the number of parking spaces within the park; lowering the playing field by six feet to allow for improved sight lines; replacing the existing playing surface; and building bridges to connect the roof tops of the three buildings to allow an elevator to be installed, thereby making the facilities more accessible.

The Common Council adopted a Resolution creating the Ad Hoc Committee for the Warner Park Stadium Renovation on October 17, 2006. The Committee...

Click here for full text