Fiscal Note
The proposed resolution authorizes a Professional Services Agreement with Short Elliott Hendrickson Inc. (SEH) for professional engineering services for the Unit Well 19 Iron, Manganese, and Radium Treatment System at an estimated cost $859,000. Funds for this project are included in the 2022 Water Utility Capital Budget Well 19 Iron and Manganese Filter project (MUNIS 10448). No additional appropriation is required.
Title
Authorizing the Mayor and the City Clerk to execute a Professional Services Agreement with Short Elliott Hendrickson Inc. (SEH) for pre-design planning, preliminary design, public participation support, final construction drawings and specifications, permitting, bidding, construction administration and commissioning for the Unit Well 19 Iron, Manganese and Radium Treatment System.
Body
WHEREAS: The water quality from Unit Well 19 (UW19) has long been less than desirable with regard to high iron, manganese and radium levels; and where recent testing confirms that these contaminants are consistently in the range of 0.2 mg/l, 0.045 mg/l, and 4.1 pCi/l respectively; and where these values are approximately 70% and 90% of the Secondary Maximum Contaminant Level (SMCL) for iron and manganese, and 82% of the Maximum Contaminant Level (MCL) for radium; and
WHEREAS: Madison Water Utility Board procedural guidelines for water quality treatment state that if a contaminant consistently exceeds 80% of either the Maximum Contaminant Level (MCL) or the Secondary Maximum Contaminant Level (SMCL), action to reduce the contaminant level is triggered; and where the objective is to correct all three water quality deficiencies with one project and bring the levels of these contaminants to well below their respective (S)MCL’s in alignment with Board policy; and
WHEREAS: Madison Water Utility has identified the need for this project has budgeted for it in the 2022 Capital Budget and planned for it in the 2023-2024 budgets; and
WHEREAS: Madiso...