Madison, WI Header
File #: 53830    Version: 1 Name: Approving roadway geometry for the Pleasant View Road Reconstruction (Mineral Point Rd to USH 14).
Type: Resolution Status: Passed
File created: 11/14/2018 In control: Engineering Division
On agenda: 1/8/2019 Final action: 1/8/2019
Enactment date: 1/14/2019 Enactment #: RES-19-00009
Title: Approving roadway geometry for the Pleasant View Road Reconstruction (Mineral Point Rd to USH 14). (9th AD)
Sponsors: Paul E. Skidmore
Attachments: 1. PVR Overall Exhibit 11-13-2018.pdf, 2. PVR PIM Typical Sections 06-28-2018.pdf, 3. Summary of Trans Commission Actions

Fiscal Note

No Appropriation Required

Title

Approving roadway geometry for the Pleasant View Road Reconstruction (Mineral Point Rd to USH 14).  (9th AD)

Body

The City is proposing to reconstruct Pleasant View Road from Mineral Point Road to USH 14 in partnership with the City of Middleton. The reconstruction will provide new gravel base, pavement, curb & gutter, multi-use path, lighting, storm sewer, sanitary sewer and water main. Pleasant View Road will be upgraded from a 2-lane to a 4-lane street. The project is currently planned for construction in three phases: Greenway Boulevard to USH 14, Old Sauk Road to Greenway Boulevard and Mineral Point Road to Old Sauk Road.

 

The City retained Strand Associates for design services for the project.  One public informational meeting was held to present designs and obtain public input.  The proposed design includes, two northbound vehicle lanes, two southbound vehicle lanes, a multi-use path on both sides of the street from Mineral Point Road to Elderberry Road, a multi-use path on the west side of the street from Mineral Point Road to Blackhawk Road and existing sidewalk to remain on the east of the street from Elderberry Road to Old Sauk Road. New medians and left turn lanes are included in the design. The intersections of Pleasant View Road with Elderberry Road and Blackhawk Road and Greenway Boulevard are proposed to be rebuilt with roundabouts.   

 

 

NOW THEREFORE BE IT RESOLVED that the roadway geometry for Pleasant View Road Reconstruction (Mineral Point Road to USH 14) is hereby approved and,

 

BE IT FURTHER RESOLVED that City Engineering and City Traffic Engineering are hereby authorized to proceed with final design for the project.