File #: 70872    Version: Name: SUBSTITUTE: Amending the 2022 Adopted Capital Budget to transfer $97,000 GO Borrowing from the Reconstruction Streets Program to Right-of-Way Landscaping Program to allow conversion of 22 medians with planting beds to turf/grass, and amending the 2022 Ado
Type: Resolution Status: Defeated
File created: 4/11/2022 In control: BOARD OF PUBLIC WORKS
On agenda: 5/10/2022 Final action: 5/10/2022
Enactment date: 5/13/2022 Enactment #:
Title: SUBSTITUTE: Amending the 2022 Adopted Capital Budget to transfer $97,000 GO Borrowing from the Reconstruction Streets Program to Right-of-Way Landscaping Program to allow conversion of 22 medians with planting beds to turf/grass, and amending the 2022 Adopted Operating Budget to provide an additional $92,000 in funding from the contingent reserve for the maintenance of an additional 41 planting beds and delaying their conversion to turf/grass. (Citywide) Amending the 2022 Adopted Capital Budget to transfer $265,000 GO Borrowing from the Reconstruction Streets Program to Right-of-Way Landscaping Program, to allow conversion of medians with planting beds to turf and concrete. (Citywide)
Sponsors: Keith Furman
Attachments: 1. 2ND PHASE_ TURN TO CONCRETE 2022__.pdf, 2. Medians 1 to 31 proposed turn to turf 2022 Packers_Northport_John Nolen etc.pdf, 3. Medians 32 to 54 Broadway_McKee_Regent_University from PROPOSED TURN TO TURF 2022.pdf, 4. 70872 version 1.pdf, 5. Scott Williams written public comments.pdf
Fiscal Note
The proposed resolution amends the 2022 Adopted Capital Budgets for Engineering - Major Streets and Engineering - Other. The resolution transfers $265,000 GO Borrowing from the Reconstruction Streets program (major 10226) into the Right-of-Way Landscaping program (major 11082). This provides funding to convert 22 planting beds to grass/turf.

Additionally, this resolution amends the 2022 Adopted Operating Budget to transfer $92,000 from the contingent reserve to the Engineering & Administration service to support maintenance of 41 planting beds planned for conversion to turf to remain as planting beds in 2022. If this item and Legistar File 70915 are both adopted, the remaining balance in the contingent reserve will be $1,688,000.



CAPITAL

($97,000) 13582-402-170
($97,000) 13582-402-801

$97,000 13627-404-200
$97,000 13627-404-802

OPERATION

($92,000) 110020-56620-00000
$92,000 40110-54255-00000

($265,000) 13582-402-170
($265,000) 13582-402-801

$265,000 13627-404-200
$265,000 13627-404-802

A contract converting 25 medians with planting beds to concrete was presented to the Board of Public Works to authorize advertisement at the April 6th meeting. The additional funding proposed with this budget amendment/transfer is required to allow for capital improvements to reconstruct 62 traffic medians with planting beds into turf only and an additional 2 medians with planting beds to concrete.

These capital projects are required to reduce operation and maintenance costs associated with medians with planted beds. Maintenance of medians with planting beds is funded by the General Operating Budget. For 2022, this portion of the Operating Budget was significantly reduced from $165,000 to $86,422. Reducing the quantity of planted medians will reduce the operating costs.
Title
SUBSTITUTE: Amending the 2022 Adopted Capital Budget to transfer $97,000 GO Borrowing from the Reconstruction Streets Prog...