File #: 52154    Version: 1 Name: Accepting storm sewer, sidewalk, and curb and gutter constructed by Private Contract at 707-709 Rethke Avenue, Private Contract 2413.
Type: Resolution Status: Passed
File created: 6/20/2018 In control: BOARD OF PUBLIC WORKS
On agenda: 7/24/2018 Final action: 7/24/2018
Enactment date: 7/30/2018 Enactment #: RES-18-00534
Title: Accepting storm sewer, sidewalk, and curb and gutter constructed by Private Contract at 707-709 Rethke Avenue, Private Contract 2413. (15th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2413 Sidewalk and curb Schedule A.pdf, 2. 2413 Storm Schedule A Unit Cost.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
7/24/20181 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
7/11/20181 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
6/20/20181 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

No Appropriation Required; Private Contract.

Title

Accepting storm sewer, sidewalk, and curb and gutter constructed by Private Contract at 707-709 Rethke Avenue, Private Contract 2413. (15th AD)

Body

WHEREAS, Rethke Washington, LLC, has satisfactorily completed the installation of storm sewer, sidewalk, and curb and gutter improvements by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, at: 707-709 Rethke Avenue.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said storm sewer, sidewalk, and curb and gutter improvements be and are hereby accepted. 

 

2. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service". 

 

 

Increase in Total Plant Value per Schedule “A”                     $5,774.51.

 

 

3. That the street improvements, sidewalk, and curb and gutter, on the following streets be and are hereby accepted:

 

                     Rethke Avenue adjacent to Lot 1 of CSM 13997.

 

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 10506  $8,883.76 for a useful life of 40 years.