Madison, WI Header
File #: 50833    Version: 1 Name: Amending the 2018 Storm Water Capital Budget and Authorizing the City of Madison, through the City Engineer, to accept Dane County Urban Water Quality grant awards in the amounts of $100,000.00 for the construction of the Wingra Park Screen Structure proj
Type: Resolution Status: Passed
File created: 3/6/2018 In control: FINANCE COMMITTEE
On agenda: 4/10/2018 Final action: 4/10/2018
Enactment date: 4/18/2018 Enactment #: RES-18-00296
Title: Amending the 2018 Storm Water Capital Budget and Authorizing the City of Madison, through the City Engineer, to accept Dane County Urban Water Quality grant awards in the amounts of $100,000.00 for the construction of the Wingra Park Screen Structure project. (13th AD)
Sponsors: Sara Eskrich
Attachments: 1. Wingra Park Screen Structure_GrantApplicationCompilied.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
4/10/20181 COMMON COUNCIL Adopt - 15 Votes RequiredPass Action details Meeting details Not available
3/26/20181 FINANCE COMMITTEE RECOMMEND TO COUNCIL TO ADOPT (15 VOTES REQUIRED) - REPORT OF OFFICERPass Action details Meeting details Not available
3/21/20181 BOARD OF PUBLIC WORKS Return to Lead with the Recommendation for ApprovalPass Action details Meeting details Not available
3/20/20181 COMMON COUNCIL ReferPass Action details Meeting details Not available
3/7/20181 Engineering Division Referred for Introduction  Action details Meeting details Not available

Fiscal Note

The proposed resolution amends the 2018 Stormwater Utility Capital Budget to accept the Dane County grant award of $100,000 for the Wingra Park Screen Structure project within the Stormwater Quality System Improvements capital program. The 2018 adopted Capital Budget includes $2.1 million for the program. The grant requires a 50% local match, or $50,000; the match will be funded through existing appropriation in the program.

 

Title

Amending the 2018 Storm Water Capital Budget and Authorizing the City of Madison, through the City Engineer, to accept Dane County Urban Water Quality grant awards in the amounts of $100,000.00 for the construction of the Wingra Park Screen Structure project.  (13th AD)

Body

WHEREAS, The 2018 Storm Water Utility Capital Budget provides funding for construction of the Wingra Park Screen Structure project, estimated to cost $210,000; and

 

WHEREAS, City Engineering has applied for and received a Dane County Urban Water Quality grant for up to $100,000.00 through a fifty percent match; and

 

WHEREAS, City Engineering would like to proceed with this project;

 

NOW, THEREFORE, BE IT RESOLVED THAT:

 

1)                      That the City of Madison, through City Engineering, is authorized to accept this grant from Dane County.

 

2)                      Be it further resolved that the City of Madison, through the City Engineer, is authorized to sign and submit the following: grant agreement, reimbursement claims, interim and final reports, and additional forms as required

 

3)                     Be it further resolved that the 2018 Stormwater Utility Capital Budget is hereby amended as follows:

                  

                                          Wingra Park Screen StructurE

                                                               10331-84-240        100,000

10331-84-240       (100,000)