Fiscal Note
No expenditure of City funds required. Any costs and work relating to public infrastructure reconstruction and/or required public street signage changes as a result of the proposed redevelopment plan and street vacation shall be the sole responsibility of the Owner/Developer and administered under Private Contract between the Owner/Developer and the City.
Title
Vacation/Discontinuance of River Birch Court from Trappers Trail / Big Stone Trail to the eastern terminus as platted by the Eighth Addition to Blackhawk Subdivision, being located in part of the Southwest one-quarter (1/4), of the Southwest one-quarter (1/4) of Section 16, Town 7 North, Range 8 East, City of Madison, Dane County, Wisconsin. (9th AD)
Body
WHEREAS, River Birch Court was dedicated to the public per the approved subdivision plat of Eighth Addition to Blackhawk Subdivision which was recorded August 11, 2006 in Volume 59-017B, Pages 91 and 92, as Document No. 4224175 Dane County Registry; and
WHEREAS, the Developer, McKenzie 300 Corporation has submitted a Letter of Intent dated October 16, 2012 as well as proposed site plans to the City Planning Division to redevelop portions of Eighth Addition to Blackhawk Subdivision by consolidating seven (7) existing platted R1 single family lots and vacated River Birch Court into two (2) lots by Certified Survey Map that are stated to remain zoned as R1 in the Developer Letter of Intent; and
WHEREAS, Mead & Hunt, the Civil Engineering / Surveying consultant for the Developer, has prepared the necessary map and legal description exhibits, “River Birch Court Vacation Exhibit” and “River Birch Court Vacation Description”, which are attached hereto and made part of this resolution; and
WHEREAS, if the concurrent redevelopment proposal submitted by the Developer is approved by the Common Council, City Engineering supports the vacation of River Birch Court as submitted; and
WHEREAS, if the concurrent redevelopment proposal and the vacation...
Click here for full text