Fiscal Note
The proposed resolution authorizes an amendment to the existing contract for engineering services for the total amount of $18,375.00. The new contract as amended will total $282,768.00.
Funding for the flood reduction analysis in the amount of $18,375.00 is provided in the Adopted Capital Budget in the Reconstruction Streets program (Riverside/Winnebago/Atwood/Eastwood Reconstruction project, MUNIS 13862-84-174). No additional appropriation is required.
Title
Authorizing the Mayor and the City Clerk to execute Amendment No. 2 to the existing Purchase of Services contract between the City of Madison and Tetra Tech, Inc. for engineering services for the East Isthmus and Yahara River Watershed Study. (2nd, 4th, 6th, 12th and 15th AD)
Body
PREAMBLE
The City of Madison Engineering Division is proposing to conduct watershed and flood studies as a result of extreme rain events over the past several years. The City entered into an agreement with Tetra Tech, Inc. for engineering services related to flooding evaluation in the East Isthmus and Yahara River watershed (RES-20-00352). The City Engineer requested additional engineering services and recommend that they be undertaken by Tetra Tech, Inc. for the East Isthmus and Yahara River Watershed Study as defined below:
1. Updated existing conditions model with new storm sewer construction projects that will impact Eastwood Drive storm sewer sizing
2. Perform modeling work to size Eastwood Drive storm sewer
NOW THEREFORE BE IT RESOLVED that the Mayor and City Clerk are hereby authorized to execute and Amendment 2 to the contract between the City of Madison and Tetra Tech, Inc. for additional design services for East Isthmus and Yahara River Watershed Study.