Fiscal Note
No City Funds required. Private contract.
Title
Accepting bituminous surface pavement constructed by Private Contract in Secret Place - Phase 8, Private Contract No. 2318. (16th AD)
Body
WHEREAS, MREC VH Madison, LLC has satisfactorily completed the installation bituminous surface pavement by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, for: Secret Places - Phase 8.
NOW, THEREFORE, BE IT RESOLVED
That the bituminous surface street improvements on the following streets be and are hereby accepted:
• Sledding Parkway from the west line of Lot 202 (existing street) to the east line of Lot 189
• Ice Pond Drive from the south line of Lot 235 (existing street) to Sledding Parkway
• Hickory Nut Court from Sledding Parkway to the south end (cul de sac)
The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B2318 by $46,208.95 for a useful life of 40 years.