File #: 75551    Version: 1 Name: Accepting bituminous surface pavement constructed by Private Contract in Secret Place - Phase 8, Private Contract No. 2318.
Type: Resolution Status: Passed
File created: 1/11/2023 In control: Engineering Division
On agenda: 2/7/2023 Final action: 2/7/2023
Enactment date: 2/10/2023 Enactment #: RES-23-00090
Title: Accepting bituminous surface pavement constructed by Private Contract in Secret Place - Phase 8, Private Contract No. 2318. (16th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. Streets Schedule A bituminous UPDATED Dec2021.pdf

Fiscal Note

No City Funds required. Private contract.

Title

Accepting bituminous surface pavement constructed by Private Contract in Secret Place - Phase 8, Private Contract No. 2318. (16th AD)

Body

WHEREAS, MREC VH Madison, LLC has satisfactorily completed the installation bituminous surface pavement by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, for:  Secret Places - Phase 8.

 

NOW, THEREFORE, BE IT RESOLVED

 

That the bituminous surface street improvements on the following streets be and are hereby accepted:

 

                     Sledding Parkway from the west line of Lot 202 (existing street) to the east line of Lot 189

                     Ice Pond Drive from the south line of Lot 235 (existing street) to Sledding Parkway

                     Hickory Nut Court from Sledding Parkway to the south end (cul de sac)

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B2318 by $46,208.95 for a useful life of 40 years.