Madison, WI Header
File #: 75548    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in Sugar Maple - Phase 1, Private Contract No. 2317.
Type: Resolution Status: Passed
File created: 1/11/2023 In control: Engineering Division
On agenda: 2/7/2023 Final action: 2/7/2023
Enactment date: 2/10/2023 Enactment #: RES-23-00088
Title: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in Sugar Maple - Phase 1, Private Contract No. 2317. (1st AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2317 Street sidewalk Schedule A.pdf, 2. 2317 Street excluding bituminous Schedule A.pdf, 3. Sanitary pipe Schedule A.pdf, 4. Sanitary structure Schedule A.pdf, 5. Storm pipe Schedule A Unit Cost.pdf, 6. Storm structure Schedule A Unit Cost.pdf, 7. Storm greenway Schedule A Unit Cost.pdf
Fiscal Note
Private Contract, No City Funds Are Required.
Title
Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in Sugar Maple - Phase 1, Private Contract No. 2317. (1st AD)
Body
WHEREAS, Sugar Maple Madison, LLC has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Sugar Maple - Phase 1


NOW, THEREFORE, BE IT RESOLVED

1. That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted.

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".

SANITARY SEWER ACCOUNTING DATA

A) Total Contract Value (including Engineering
And Miscellaneous Costs) $ 472,865.12

B) Contributions in Aid of Construction:
a) Public Sewer Components $ 472,865.12
b) Sewer Laterals $ -0-

C) Investments in Capital (MSU Share) $ -0-

D) Total Plant Value $ 472,865.12

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".

Increase in Total Plant Value per Schedule “A” $276,820.32.

4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:

· Lost Pine Trial from Sugar Maple Lane to the east plat limits
· Wild Prairie Rd from Cherry Blossom Drive to the ea...

Click here for full text