Fiscal Note
The projected cost for the remainder of 2011 is approximately $630 (or $890 including fringe benefits) and is available in the Monona Terrace budget through management of salary savings. The estimated annualized cost is $11,400 (or $16,300 including fringe benefits).
Title
SUBSTITUTE Recreate the position (#3293) of Building Maintenance Supervisor (CG18-R06) as a Building Maintenance and Technical Supervisor (CG18-R08) (CG18 R10) and reallocate the incumbent (J. Griffith) to the new position in the Monona Terrace budget.
Body
Resolution that position #3293 of "Building Maintenance Supervisor" in Compensation Group 18, Range 06, currently occupied by J. Griffith, in the permanent salary detail of the Monona Terrace budget, is deleted and recreated as a "Building Maintenance and Technical Supervisor" in CG18, Range 08, (CG18 R10) and that the incumbent is reallocated to the new position, thereof.