Madison, WI Header
File #: 75763    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In First Addition to 1000 Oaks Phase 2, Private Contract No. 7855.
Type: Resolution Status: Passed
File created: 1/26/2023 In control: Engineering Division
On agenda: 2/28/2023 Final action: 2/28/2023
Enactment date: 3/6/2023 Enactment #: RES-23-00142
Title: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In First Addition to 1000 Oaks Phase 2, Private Contract No. 7855 (1st AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 7855 Street Schedule A excluding bituminous.pdf, 2. First Add to 1000 Oaks ph 2 Sanitary Schedule A Unit Cost.pdf, 3. First Add to 1000 Oaks Ph 2 Storm Schedule A Unit Cost.pdf

Fiscal Note

No City Funds required. Private contract.

Title

Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In First Addition to 1000 Oaks Phase 2, Private Contract No. 7855 (1st AD)

Body

WHEREAS, VH 1000 Oaks, LLC, has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  First Addition to 1000 Oaks Phase 2.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted. 

 

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service". 

 

SANITARY SEWER ACCOUNTING DATA

 

A)                     Total Contract Value (including Engineering

                     and Miscellaneous Costs)                                                               $                     57,110.01                     

 

B)                     Contributions in Aid of Construction:

                     a)                     Public Sewer Components                                          $                     57,110.01                     

                     b)                     Sewer Laterals                                                               $                     -0-                                          

 

C)                     Investments in Capital (MSU Share)                     $                     -0-                                          

 

D)                     Total Plant Value                                                                                    $                     $57,110.01                     

 

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service". 

 

 

Increase in Total Plant Value per Schedule “A”                     $110,165.00.

 

 

4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:

 

 

                     Gilded Cider Boulevard - North from Gingergrass Way to Quiet Pond Drive

                     Gingergrass Way from 53’ South of Watts Road to Gilded Cider Boulevard - North

                     OL 4 Alley  from Gingergrass Way to Quiet Pond Drive

                     Quiet Pond Drive from 100’ South of Watts Road to Gilded Cider Boulevard - North

                     South Point Road from 100’ South of Watts Road to Gilded Cider Boulevard - North (sidewalk only)

 

 

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 11500 $152,582.17 for a useful life of 40 years.