39310
| 1 | 2. | Consider a Report of the City Engineer regarding the results of a review of water resources impacts and the necessity of permits for public works construction projects on this agenda and addendum to the agenda. | Miscellaneous | Consider a Report of the City Engineer regarding the results of a review of water resources impacts and the necessity of permits for public works construction projects on this agenda and addendum to the agenda. | | |
Action details
|
Not available
|
39288
| 1 | 4. | Approving temporary construction work with associated noise impacts between the hours of 7:00 PM and 7:00 AM on West Lakeside Street east of the intersection of West Lakeside Street and Lake Court. | Resolution | Approving temporary construction work with associated noise impacts between the hours of 7:00 PM and 7:00 AM on West Lakeside Street east of the intersection of West Lakeside Street and Lake Court. (13th AD) | RECOMMEND TO COUNCIL TO ADOPT - REPORT OF OFFICER | |
Action details
|
Not available
|
38877
| 1 | 5. | Ban the Box | Ordinance | AMENDED SUBSTITUTE Creating Section 39.08 and Section 33.07(7)(k)14. of the Madison General Ordinances to create a policy requiring certain city contractors to “Ban the Box” by eliminating questions about criminal and arrest record in their hiring practices, when contracting with the City, creating Sec. 33.07(7)(k)14. to make Ban the Box a prequalification requirement, and amending Sec. 39.07(3)(c)10. to exempt credit rating agencies from the Equal Benefits ordinance. | Refer | |
Action details
|
Not available
|
39081
| 1 | 6. | Determining a Public Purpose and Necessity and adopting a Relocation Order for the acquisition of land interests required for the construction of a bike and pedestrian path between the West Beltline Highway and Tree Lane. | Resolution | Determining a Public Purpose and Necessity and adopting a Relocation Order for the acquisition of land interests required for the construction of a bike and pedestrian path between the West Beltline Highway and Tree Lane. (9th AD) | RECOMMEND TO COUNCIL TO ADOPT - REPORT OF OFFICER | |
Action details
|
Not available
|
39292
| 1 | 7. | Authorizing an amendment to the contract between the City of Madison & Eppstein Uhen Architects, in the amount of $37,420 for additional architectural & engineering design services for the Fire Administration Office Building Tenant Improvements & Fire Sta | Resolution | Authorizing an amendment to the contract between the City of Madison and Eppstein Uhen Architects, in the amount of $37,420 for additional architectural and engineering design services for the Fire Administration Office Building Tenant Improvements and Fire Station No. 1 Remodel project. | RECOMMEND TO COUNCIL TO ADOPT - REPORT OF OFFICER | |
Action details
|
Not available
|
39304
| 1 | 8. | Approving plans & specs for Felland Road Resurfacing - 2015, authorizing the BPW to advertise & receive bids, authorizing the Mayor & City Clerk to enter into a cost sharing agreement with the Town of Burke & amending the 2015 Engineering- Major Streets | Resolution | Approving plans and specifications for Felland Road Resurfacing - 2015, authorizing the Board of Public Works to advertise and receive bids, Authorizing the Mayor and City Clerk to enter into a cost sharing agreement with the Town of Burke and amending the 2015 Engineering- Major Streets Capital Budget. | Return to Lead with the Recommendation for Approval | |
Action details
|
Not available
|
39311
| 1 | 9. | Approving plans & specifications & authorizing the Board of Public Works to advertise & receive bids for Ice Age Junction Path - Tree Lane Segment and East Mendota-Pheasant Branch Greenway - Mineral Point Section Regrading. | Resolution | Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for Ice Age Junction Path - Tree Lane Segment and East Mendota-Pheasant Branch Greenway - Mineral Point Section Regrading. (9th AD) | RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICER | |
Action details
|
Not available
|
39321
| 1 | 10. | Change Order No. 1 to Contract No. 7433, State Street Sidewalk Repairs, to Joe Daniels Construction Co., Inc. for $5,476.00 for the removal of the bus shelter at the 100 block of State Street. | Miscellaneous | Change Order No. 1 to Contract No. 7433, State Street Sidewalk Repairs, to Joe Daniels Construction Co., Inc. for $5,476.00 for the removal of the bus shelter at the 100 block of State Street. | Approve | |
Action details
|
Not available
|
39325
| 1 | 11. | Change Order No. 1 to Contract No. 7366, Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 10) - 2015, to Madison Commercial Landscapes for $7,200.00. | Miscellaneous | Change Order No. 1 to Contract No. 7366, Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 10) - 2015, to Madison Commercial Landscapes for $7,200.00. | Approve | |
Action details
|
Not available
|
39336
| 1 | 12. | Change Order No. 3 to Contract No. 7381, Johns Street and Emil Street Utilities with Resurfacing Assessment District to RG Huston Company for $3,073.50 with 1-additional day. | Miscellaneous | Change Order No. 3 to Contract No. 7381, Johns Street and Emil Street Utilities with Resurfacing Assessment District to RG Huston Company for $3,073.50 with 1-additional day. | Approve | |
Action details
|
Not available
|
39337
| 1 | 13. | Change Order No. 4 to Contract No. 7381, Johns Street and Emil Street Utilities with Resurfacing Assessment District to RG Huston Company for $2,486.50 with 1-additional day. | Miscellaneous | Change Order No. 4 to Contract No. 7381, Johns Street and Emil Street Utilities with Resurfacing Assessment District to RG Huston Company for $2,486.50 with 1-additional day. | Approve | |
Action details
|
Not available
|
39338
| 1 | 14. | Change Order No. 3 to Contract No. 6983, Royster Corners Assessment District - 2014, to RG Huston Company for $15,972.90 with an additional 70-days. | Miscellaneous | Change Order No. 3 to Contract No. 6983, Royster Corners Assessment District - 2014, to RG Huston Company for $15,972.90 with an additional 70-days. | Approve | |
Action details
|
Not available
|
39368
| 1 | 15. | Change Order No. 1 to Contract No. 7348, E. Washington Avenue Median Replanting - 2014 South, to Dan Larsen Landscaping for $4,789.40. | Miscellaneous | Change Order No. 1 to Contract No. 7348, E. Washington Avenue Median Replanting - 2014 South, to Dan Larsen Landscaping for $4,789.40. | Refer | |
Action details
|
Not available
|
39369
| 1 | 16. | Change Order No. 1 to Contract No. 7349, E. Washington Avenue Median Replanting - 2014 North, to Dan Larsen Landscaping for $6,564.60. | Miscellaneous | Change Order No. 1 to Contract No. 7349, E. Washington Avenue Median Replanting - 2014 North, to Dan Larsen Landscaping for $6,564.60. | Refer | |
Action details
|
Not available
|
39309
| 1 | 17.* | Subcontractor List for Contract No. 7392, Nakoma Park Pedestrian Entrance Steps - Masonry Repairs to DRAX, Inc. for 85.45%. | Miscellaneous | Subcontractor List for Contract No. 7392, Nakoma Park Pedestrian Entrance Steps - Masonry Repairs to DRAX, Inc. for 85.45%. | Approve | |
Action details
|
Not available
|
39357
| 1 | 18.* | Subcontractor list for Contract No. 7524, Fire Station #4 Roof Replacement to Joe Daniels Construction Co., Inc. for 73.01%. | Miscellaneous | Subcontractor list for Contract No. 7524, Fire Station #4 Roof Replacement to Joe Daniels Construction Co., Inc. for 73.01%. | Approve | |
Action details
|
Not available
|
39344
| 1 | 20. | Awarding Public Works Contract No. 7498, Unit Well 12 Upgrade and Conversion to a Two Zone Well. | Resolution | Awarding Public Works Contract No. 7498, Unit Well 12 Upgrade and Conversion to a Two Zone Well. | Reject Bids | |
Action details
|
Not available
|
39345
| 1 | 21. | Awarding Public Works Contract No. 7526, Owl Creek Park Improvements - Phase 2. | Resolution | Awarding Public Works Contract No. 7526, Owl Creek Park Improvements - Phase 2. | RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICER | |
Action details
|
Not available
|
39346
| 1 | 22. | Awarding Public Works Contract No. 7529, Reconstruction of the Madison Water Utility Operations Center, 110 S. Paterson Street. | Resolution | Awarding Public Works Contract No. 7529, Reconstruction of the Madison Water Utility Operations Center, 110 S. Paterson Street. | RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICER | |
Action details
|
Not available
|
39347
| 1 | 23. | Awarding Public Works Contract No. 7537, North Ave. Water Main Extension. | Resolution | Awarding Public Works Contract No. 7537, North Ave. Water Main Extension. | RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICER | |
Action details
|
Not available
|