22169
| 1 | 1. | Reviewing the Public Participation Process for water utility facilities and developing a corresponding Board Process Policy | Miscellaneous | Reviewing the Public Participation Process for water utility facilities | | |
Action details
|
Not available
|
23148
| 1 | 2. | exhibits from East Side Water Supply (ESWS) Learning & Listening Events | Report | Reviewing exhibits from East Side Water Supply (ESWS) Learning & Listening Events June 27 and 30, 2011 | | |
Action details
|
Not available
|
23127
| 1 | 3. | Presentation of ESWS Technical Memos | Report | Presentation of East Side Water Supply Project technical memos | | |
Action details
|
Not available
|
23134
| 1 | 4. | Presentation of ESWS Citizen Advisory Panel perspective and advisories | Report | Presentation of ESWS Citizen Advisory Panel (CAP) perspectives and advisories on the Public Participation Process, conservation, water demand, and iron and manganese. | | |
Action details
|
Not available
|
23139
| 1 | 5. | ESWS- Well 15 VOC removal recommendation | Miscellaneous | SUBSTITUTE: Accept the recommendation of the East Side Water Supply Citizens Advisory Panel and staff to use an appropriate treatment technology to mitigate volatile organic compounds on site at Unit Well 15. Initiate detailed design following completion of conceptual design. Continue the Public Participation Process, including discussions of treatment technology selection, with the Well 15 Citizens Advisory Panel through Phase 3 - Facility Design. | | |
Action details
|
Not available
|
23140
| 1 | 6. | ESWS- Well 15 Fe and Mn Removal Recommendation | Miscellaneous | SUBSTITUTE: Accept the recommendation of the East Side Water Supply Citizens Advisory Panel and staff to use an appropriate treatment technology to remove iron and manganese from Unit Well 8. Allow room for potential future treatment needs due to nearby sources of groundwater contamination. Continue the Public Participation Process with a Well 8 Citizens Advisory Panel through Phase 2 - Facility Site Selection and Phase 3 - Facility Design. | | |
Action details
|
Not available
|
23141
| 1 | 7. | ESWS Well 7 Fe and Mn Removal Recommendation | Miscellaneous | SUBSTITUTE: Accept the recommendation of the East Side Water Supply Citizens Advisory Panel and staff to use an appropriate treatment technology to remove iron and manganese from Unit Well 7. Allow room for potential future treatment needs. Continue the Public Participation Process with a Well 7 Citizens Advisory Panel through Phase 2 - Facility Site Selection and Phase 3 - Facility Design. | | |
Action details
|
Not available
|
23142
| 1 | 8. | ESWS- Well 3 Replacement Recommendation | Miscellaneous | SUBSTITUTE: Accept the recommendation of the East Side Water Supply Citizens Advisory Panel and staff to replace Unit Well 3, which was abandoned in 2008 due to water quality issues. Continue the Public Participation Process with a Well 3 Replacement Citizens Advisory Panel through Phase 2 - Facility Site Selection and Phase 3 - Facility Design. | | |
Action details
|
Not available
|