48444
| 1 | D.1. | | Miscellaneous | Public Market Site Plan Review | | |
Action details
|
Not available
|
48442
| 1 | D.2. | | Miscellaneous | Blair John Nolen Corridor Study Update | | |
Action details
|
Not available
|
47509
| 1 | E.1. | Adopting the Darbo-Worthington-Starkweather Neighborhood Plan | Resolution | Adopting the Darbo-Worthington-Starkweather Neighborhood Plan as a Supplement to the City of Madison Comprehensive Plan. | Return to Lead with the Following Recommendation(s) | Pass |
Action details
|
Not available
|
48174
| 1 | E.2. | Approving the roadway geometry for East Johnson Street from Baldwin Street to First Street (2nd and 12th AD), authorizing to execute an Amendment to the contract with the design consultant, and Amending the 2017 Engineering Major Streets Capital Budget to | Resolution | Approving the roadway geometry for East Johnson Street from Baldwin Street to First Street (2nd and 12th AD), authorizing to execute an Amendment to the contract with the design consultant, and Amending the 2017 Engineering Major Streets Capital Budget to transfer $140,000 of GO Borrowing from the Mckee Road (CTH PD) Improvements project to the East Johnson Street: Baldwin to 1st Street project. | Return to Lead with the Following Recommendation(s) | |
Action details
|
Not available
|
48175
| 1 | E.3. | Approving the roadway geometry for CTH AB - Buckeye Road from Monona Drive to Stoughton Road (15th AD), authorizing an Amendment to the contract with the design consultant, and Amending the 2017 Engineering Major Streets Capital Budget by transferring $65 | Resolution | Approving the roadway geometry for CTH AB - Buckeye Road from Monona Drive to Stoughton Road (15th AD), authorizing an Amendment to the contract with the design consultant, and Amending the 2017 Engineering Major Streets Capital Budget by transferring $65,000 of GO Borrowing from the McKee Road (CTH PD) Improvement project to the Buckeye Road project. | Return to Lead with the Following Recommendation(s) | |
Action details
|
Not available
|
48460
| 1 | F.1. | | Miscellaneous | Discussion on Downtown Sidewalk Width Analysis Priority from Madison in Motion. | | |
Action details
|
Not available
|
42190
| 1 | G.1. | | Miscellaneous | Potential Future Agenda Items - PBMVC
· East Washington Corridor Study
· Crash Report Analysis
· Bicycle Equity Report
· Bicycle/Pedestrian Projects Priority Draft Plan
· East/West Wilson-East Doty-South Pinckney-MLK Initial Review | | |
Action details
|
Not available
|