Madison, WI Header
File #: 79668    Version: 1 Name: Accepting bituminous surface pavement constructed by Private Contract in Acacia Ridge – Surface Paving, Private Contract No. 8200.
Type: Resolution Status: Passed
File created: 8/30/2023 In control: Engineering Division
On agenda: 9/19/2023 Final action: 9/19/2023
Enactment date: 9/25/2023 Enactment #: RES-23-00580
Title: Accepting bituminous surface pavement constructed by Private Contract in Acacia Ridge - Surface Paving, Private Contract No. 8200. (District 1)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 8200 Streets Schedule A bituminous.pdf

Fiscal Note

No City Funds required. Private contract.

Title

Accepting bituminous surface pavement constructed by Private Contract in Acacia Ridge - Surface Paving, Private Contract No. 8200. (District 1)

Body

WHEREAS, East South Point, LLC has satisfactorily completed the installation bituminous surface pavement by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, for: Acacia Ridge - Surface.

NOW, THEREFORE, BE IT RESOLVED

 

That the bituminous surface street improvements on the following streets be and are hereby accepted:

 

                     Feather Sound Drive from 196’ S of Watts Road to Watts Road

                     Feather Sound Drive from Watts Road to Highland Gate Way

                     Feather Sound Drive from Highland Gate Way to Honey Elm Ln

                     Feather Sound Drive from Honey Elm Ln to Harvest Moon Ln

                     Roman Mist Way from Highland Gate Way to Honey Elm Ln

                     Highland Gate Way from Feather Sound Drive to Roman Mist Way

                     Watts Road from South Point Road to Feather Sound Drive

                     Watts Road from Feather Sound Drive to Stone Arbor Trl

                     Sleepy Pond Way from Feather Sound Drive to 160’ E of Feather Sound Drive

                     Feather Sound Drive from Clear Rise Blvd (N) to Sleepy Pond Way

                     Feather Sound Drive from Clear Rise Blvd (S) to Clear Rise Blvd (N)

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 11937 by $69,286.06 for a useful life of 40 years.