Madison, WI Header
File #: 77148    Version: 1 Name: Accepting bituminous surface pavement constructed by Private Contract in Birchwood Point South – Surface, Private Contract No. 8197.
Type: Resolution Status: Passed
File created: 4/6/2023 In control: Engineering Division
On agenda: 5/2/2023 Final action: 5/2/2023
Enactment date: 5/8/2023 Enactment #: RES-23-00350
Title: Accepting bituminous surface pavement constructed by Private Contract in Birchwood Point South - Surface, Private Contract No. 8197 (1st AD).
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 8197 Street Schedule A bituminous (Surface Paving).pdf

Fiscal Note

No City Funds required. Private contract.

Title

Accepting bituminous surface pavement constructed by Private Contract in Birchwood Point South - Surface, Private Contract No. 8197 (1st AD).

Body

That the bituminous surface street improvements on the following streets be and are hereby accepted:

 

 

                     Watts Road from the West line of Lot 277 to Old Timber Pass (West)

                     Watts Road from Old Timber Pass (West) to Old Timber Pass (East)

                     Watts Road from Old Timber Pass (East) to Sugar Maple Lane

                     Watts Road from Sugar Maple Lane to Noble Oak Run

                     Watts Road from Noble Oak Run to the East line of Outlot 4

                     Old Timber Pass (West) from 212’ North of Quiet Leaf Drive to Sleepy Pine Ridge

                     Old Timber Pass (West) from Sleepy Pine Ridge to Watts Road

                     Old Timber Pass (East) from 212’ North of Quiet Leaf Drive to Sleepy Pine Ridge

                     Old Timber Pass (East) from Sleepy Pine Ridge to Watts Road

                     Sleepy Pine Ridge from Old Timber Pass (West) to Old Timber Pass (East)

                     Sleepy Pine Ridge from Old Timber Pass (East) to Sugar Maple Lane

                     Sleepy Pine Ridge from Sugar Maple Lane to 98’ SE of Sugar Maple Lane

                     Sugar Maple Lane from the South line of Lot 320 to Sleepy Pine Ridge

                     Sugar Maple Lane from Sleepy Pine Ridge to Watts Road

                     Sugar Maple Lane from Watts Road to the North Plat Line

                     Noble Oak Run from Sleepy Pine Ridge to Watts Road

                     Hazy Sky Parkway from the West line of Lot 378 to Old Timber Pass

                     Hazy Sky Parkway from Old Timber Pass to 165’ Est of Old Timber Pass

                     Old Timber Pass from 66’ South of Hazy Sky Parkway to Hazy Sky Parkway

                     Old Timber Pass from Hazy Sky Parkway to Quiet Leaf Drive

                     Old Timber Pass from Quiet Leaf Drive to 181’ North of Quiet Leaf Drive

                     Old Timber Pass (West) from 181’ North of Quit Leaf Drive to 299’ North of Quiet Leaf Drive

                     Old Timber Pass (East) from 181’ North of Quiet Leaf Drive to 299’ North of Quiet Leaf Drive

                     Quiet Leaf Drive from the West line of Lot 290 to Old Timber Pass

                     Quiet Leaf Drive from Old Timber Pass to 159’ East of Old Timber Pass

 

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 11934 by $ 2 4 3 , 8 9 9 . 7 9 for a useful life of 40 years.