Madison, WI Header
File #: 76225    Version: 1 Name: Accepting final report and proposed solutions of the Pheasant Branch Watershed Report.
Type: Report Status: Items Referred
File created: 2/14/2023 In control: BOARD OF PUBLIC WORKS
On agenda: 3/21/2023 Final action: 3/8/2023
Enactment date: Enactment #:
Title: Accepting final report and proposed solutions of the Pheasant Branch Watershed Report. (9th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. PheasantBranch_2023_Background.pdf

Title

Accepting final report and proposed solutions of the Pheasant Branch Watershed Report. (9th AD)

Body

City Engineering is bringing the first completed watershed study before the Board of Public Works. Watershed Studies will be completed for the City’s 22 watersheds over the next 5-10 years. This study is called the Pheasant Branch Watershed Study. The Pheasant Branch Watershed is located on the far west side of the City of Madison.  The Watershed Study Report describes the methodology, approach, and results of the watershed study.