Madison, WI Header
File #: 70716    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in Vang Homesites, Private Contract No. 8270.
Type: Resolution Status: Passed
File created: 3/28/2022 In control: Engineering Division
On agenda: 4/19/2022 Final action: 4/19/2022
Enactment date: 4/25/2022 Enactment #: RES-22-00283
Title: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in Vang Homesites, Private Contract No. 8270. (17 AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 8270 Sanitary Schedule A Unit Cost.pdf, 2. 8270 Street Schedule A excluding bituminous.pdf

Fiscal Note

Private contract. No City funds are required.

Title

Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in Vang Homesites, Private Contract No. 8270. (17 AD)

Body

WHEREAS, Chiatong Enterprise Inc. has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in Vang Homesites.

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said sanitary sewer and street improvements (excluding bituminous surface pavement) be and are hereby accepted. 

 

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service". 

 

SANITARY SEWER ACCOUNTING DATA

 

A)                     Total Contract Value (including Engineering

                     And Miscellaneous Costs)                                                               $                     53,563.16                     

 

B)                     Contributions in Aid of Construction:

                     a)                     Public Sewer Components                                          $                     53,563.16                     

                     b)                     Sewer Laterals                                                                                    $                     -0-                                          

 

C)                     Investments in Capital (MSU Share)                                          $                     -0-                                          

 

D)                     Total Plant Value                                                                                    $                     53,563.16                     

 

 

3. That the sidewalk improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:

 

                     West side of Portage Road from the SW line of Lot 1 to the NE line of Lot 11.

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 11920  $ 32,051.32 for a useful life of 40 years.