Madison, WI Header
File #: 65107    Version: 1 Name: Accepting storm sewer and street improvements (sidewalk) constructed by Private Contract at The American Center Outlot 7 CSM - 5401 Eastpark Blvd., Private Contract No. 8362
Type: Resolution Status: Passed
File created: 4/14/2021 In control: Engineering Division
On agenda: 5/4/2021 Final action: 5/4/2021
Enactment date: 5/10/2021 Enactment #: RES-21-00325
Title: Accepting storm sewer and street improvements (sidewalk) constructed by Private Contract at The American Center Outlot 7 CSM - 5401 Eastpark Blvd., Private Contract No. 8362 (17th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 8362 Storm Schedule A Unit Cost.pdf, 2. 8362 Street Schedule A Sidewalk.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
5/4/20211 COMMON COUNCIL Adopt Unanimously Under Suspension of Rules 2.04, 2.24, & 2.25Pass Action details Meeting details Not available
4/21/20211 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
4/14/20211 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

Private contract. No City funds required.

Title

Accepting storm sewer and street improvements (sidewalk) constructed by Private Contract at The American Center Outlot 7 CSM - 5401 Eastpark Blvd., Private Contract No. 8362 (17th AD)

Body

WHEREAS, American Family Mutual Insurance Company, S.I.  has satisfactorily completed the installation of storm sewer and street improvements (sidewalk) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, at:The American Center Outlot 7 CSM - 5401 Eastpark Blvd.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said storm sewer and street improvements (sidewalk) be and are hereby accepted. 

 

2. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service". 

 

 

Increase in Total Plant Value per Schedule “A”                     $198,421.10

 

 

 

4. That the street improvements (sidewalk) on the following streets be and are hereby accepted:

 

                     Eastpark Boulevard from East Terrace Drive to American Parkway

 

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 12581  $ 23,416.92 for a useful life of 40 years.