File #: 63852    Version: 1 Name: Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for the Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered (Districts 13 and 14) by th
Type: Resolution Status: Passed
File created: 1/22/2021 In control: Engineering Division
On agenda: 2/23/2021 Final action: 2/23/2021
Enactment date: 3/3/2021 Enactment #: RES-21-00127
Title: Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for the Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered (Districts 13 and 14) by the Common Council (13th and 14th ADs)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. Ald Dist 13 Map_Include w Ordered Repairs.pdf, 2. Ald Dist 14 Map_Include w Ordered Repairs.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
2/23/20211 COMMON COUNCIL Adopt Unanimously Under Suspension of Rules 2.04, 2.24, & 2.25Pass Action details Meeting details Not available
2/3/20211 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
1/22/20211 Engineering Division Refer  Action details Meeting details Not available
Fiscal Note
The proposed resolution approves plans and specifications and authorizes the Board of Public Works to advertise and receive bids for the annual reconstruction of concrete sidewalk and incidental concrete curb and gutter work for Districts 13 and 14 at a total estimated cost of $2,755,000. Of the total cost, $1,095,000 is assessable. Funding is available in the following MUNIS accounts. No additional appropriation is required.

13220-403-200 $1,250,000
13221-403-200 $1,465,000
13434-403-200 $40,000
Title
Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for the Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered (Districts 13 and 14) by the Common Council (13th and 14th ADs)
Body
PREAMBLE

The Common Council adopted a plan in 1996 to repair defective sidewalk throughout the City on a ten-year cycle. The plan was updated in 2002 and 2012 to reflect the completed work and to incorporate the reconstituted aldermanic districts. The 13th and 14th Aldermanic Districts have been scheduled for repair in 2021.

Offset, settled or badly cracked sidewalk sections are replaced with this program. Costs for the improvement of sidewalk are assessed to the various parcels based on assessable frontage in accordance with the City of Madison Policy for the Assessment of Street Improvements. The program is also used to install curb ramps at intersections. Curb ramps are funded solely by the City. Additionally, in an effort to make Madison Metro Transit bus stops ADA compliant, multiple locations will be improved by adding concrete boarding pads. Bus pads are funded solely by the City.

NOW THEREFORE BE IT RESOLVED that the plans and specifications for the Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered (Districts 13 and 14) by the Common Council be and are hereby approved:

BE IT F...

Click here for full text