Madison, WI Header
File #: 60150    Version: 1 Name: Authorizing the Mayor and City Clerk to execute Amendment No. 2 to the existing Purchase of Services contract between the City of Madison and Stantec Consulting Services, Inc. for engineering services for the Dunn’s Marsh Watershed Study.
Type: Resolution Status: Passed
File created: 4/3/2020 In control: Engineering Division
On agenda: 5/5/2020 Final action: 5/5/2020
Enactment date: 5/12/2020 Enactment #: RES-20-00347
Title: Authorizing the Mayor and City Clerk to execute Amendment No. 2 to the existing Purchase of Services contract between the City of Madison and Stantec Consulting Services, Inc. for engineering services for the Dunn’s Marsh Watershed Study. (10th and 20th AD)
Sponsors: BOARD OF PUBLIC WORKS
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
5/5/20201 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
4/22/20201 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
4/3/20201 Engineering Division Refer  Action details Meeting details Not available
Fiscal Note
The proposed resolution authorizes the Mayor and City Clerk to amend Contract 8431 with Stantec Consulting Services to increase the scope of the Dunn’s Marsh Watershed study to include the adjacent bike path. The cost of this contract is shared between the City of Madison, Dane County, and the City of Fitchburg, as authorized under RES-19-00285. The resolution would increase the City of Madison’s share of the cost by $20,000. Funding is available in the 2020 Adopted Operating Budget for Stormwater Consulting Services.
Title
Authorizing the Mayor and City Clerk to execute Amendment No. 2 to the existing Purchase of Services contract between the City of Madison and Stantec Consulting Services, Inc. for engineering services for the Dunn’s Marsh Watershed Study. (10th and 20th AD)
Body
The City of Madison Engineering Division is currently conducting watershed and flood studies for the west and near west sides as a result of extreme rain events over the past several years. The City has previously entered into an agreement with Stantec Consulting Services, Inc. for engineering services (RES-19-00520) and the first Amendment to that agreement (RES-19-00767) to conduct the Dunn’s Marsh Watershed Study. City Engineering is requesting additional engineering services for this watershed and recommends that they be undertaken by Stantec Consulting Services, Inc. for the Dunn’s Marsh Watershed Study as defined below:
WHEREAS, the Common Council has authorized funding for continued watershed study efforts as part of the adopted 2020 Stormwater Utility Operating Budget; and
WHEREAS, the Common Council has approved RES-19-00285 which authorizes the City of Madison to contribute $20,000.00 toward a joint watershed study, with Dane County and the City of Fitchburg for the area draining to the intersection of the Capital City State Trail, the Badger State Trail land the Cannonball bike trail; and
WHEREAS, at Stantec Consulting Services is completing the Dunn’s Marsh...

Click here for full text