Fiscal Note
Private Contract, No City Funds Are Required.
Title
Accepting bituminous surface pavement constructed by Private Contract in Birchwood Point - Phase 7, Private Contract No. 7759 (9th AD)
Body
WHEREAS, MREC VH Birchwood Point, LLC has satisfactorily completed the installation bituminous surface pavement by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, for: Birchwood Point - Phase 7.
NOW, THEREFORE, BE IT RESOLVED
That the bituminous surface street improvements on the following streets be and are hereby accepted:
• Blooming Leaf Way from N Line of Lot 71 to Meandering Way
• Meandering Way from 155’ W of Blooming Leaf Way to E line of Lot 66
The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 11419 by $12,282.13 for a useful life of 40 years.