Madison, WI Header
File #: 59137    Version: 1 Name: Accepting sidewalk improvements and bituminous surface pavement constructed by Private Contract In Birchwood Point - Phase 1, Private Contract No. 2369
Type: Resolution Status: Passed
File created: 1/14/2020 In control: Engineering Division
On agenda: 2/4/2020 Final action: 2/4/2020
Enactment date: 2/7/2020 Enactment #: RES-20-00086
Title: Accepting sidewalk improvements and bituminous surface pavement constructed by Private Contract In Birchwood Point - Phase 1, Private Contract No. 2369 (9th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2369 Sidewalk Schedule A.pdf, 2. 2369 Streets Schedule A bituminous Schedule A.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
2/4/20201 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
1/22/20201 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
1/14/20201 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

Private Contract. No City Funds Are Required.

Title

Accepting sidewalk improvements and bituminous surface pavement constructed by Private Contract In Birchwood Point - Phase 1, Private Contract No. 2369 (9th AD)

Body

WHEREAS, the MREC VH Birchwood Point, LLC, has satisfactorily completed the installation of sidewalk improvements and bituminous surface pavement by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  Birchwood Point - Phase 1.

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said sidewalk improvements and bituminous surface pavement be and are hereby accepted.

 

2. That the sidewalk improvements and bituminous surface pavement on the following streets be and are hereby accepted:

                     Arbor Mist Pass from W Line of Lot 192 to Sugar Maple Lane

                     Shady Birch Trail from W Line of Lot 205 to Sugar Maple Lane

                     Silicon Prairie Parkway from Sugar Maple Lane to E Line of Lot 38

                     Sugar Maple Lane from N Line of Lot 33 to South Plat Limit

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 10190  $ 99,100.70 for a useful life of 40 years.