Madison, WI Header
File #: 55692    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in Village at Autumn Lake Phase 4, Private Contract No. 7864.
Type: Resolution Status: Passed
File created: 5/1/2019 In control: Engineering Division
On agenda: 5/21/2019 Final action: 5/21/2019
Enactment date: 5/24/2019 Enactment #: RES-19-00411
Title: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in Village at Autumn Lake Phase 4, Private Contract No. 7864. (17th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 7864 Street Schedule A excluding bituminous.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
5/21/20191 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
5/8/20191 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
5/1/20191 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

Private Contract. No Appropriation Required.

Title

Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in  Village at Autumn Lake Phase 4, Private Contract No. 7864.  (17th AD)

Body

WHEREAS, VAL, LLC has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Village at Autumn Lake Phase 4

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted. 

 

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service". 

 

SANITARY SEWER ACCOUNTING DATA

 

A)                     Total Contract Value (including Engineering

                     And Miscellaneous Costs)                                                               $                     141,955.00                     

 

B)                     Contributions in Aid of Construction:

                     a)                     Public Sewer Components                                          $                     141,955.00                     

                     b)                     Sewer Laterals                                                                                    $                     -0-                                          

 

C)                     Investments in Capital (MSU Share)                                          $                     -0-                                          

 

D)                     Total Plant Value                                                                                    $                     141,955.00                     

 

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service". 

 

 

Increase in Total Plant Value per Schedule “A”                     $127,379.45

 

 

4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:

 

                     Levitan Lane from the west property line of Lot 700 to the east property line of Lot 698.

                     Morning Mist Way from Summer Shine Drive to Levitan Lane.

                     Summer Shine Drive from Willow Rock Road to the west property line of Lot 565

                     Willow Rock Road from Lien Road to Summer Shine Drive

                     Rustin Pebble Lane from the west property line of Lot 554 to Morning Mist Way

 

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No 11509  $252,125.39 for a useful life of 40 years.