File #: 52896    Version: 1 Name: Approving temporary construction work with associated noise impacts between the hours of 7:00 PM and 7:00 AM for work associated with Madison Metropolitan Sewerage District Pump Station 10 Forcemain Rehabilitation (Buckeye Road to Cottage Grove Road).
Type: Resolution Status: Passed
File created: 8/17/2018 In control: Engineering Division
On agenda: 9/25/2018 Final action: 9/25/2018
Enactment date: 9/28/2018 Enactment #: RES-18-00681
Title: Approving temporary construction work with associated noise impacts between the hours of 7:00 PM and 7:00 AM for work associated with Madison Metropolitan Sewerage District Pump Station 10 Forcemain Rehabilitation (Buckeye Road to Cottage Grove Road). (16th AD)
Sponsors: Michael J. Tierney
Attachments: 1. PumpingStation10 postcard (front)final.pdf, 2. PumpingStation10 postcard (back)final.pdf
Fiscal Note
No Appropriation Required
Title
Approving temporary construction work with associated noise impacts between the hours of 7:00 PM and 7:00 AM for work associated with Madison Metropolitan Sewerage District Pump Station 10 Forcemain Rehabilitation (Buckeye Road to Cottage Grove Road). (16th AD)
Body
PREAMBLE

The Madison Metropolitan Sewerage District (MMSD) Pump Station 10 Forcemain project intends to rehabilitate approximately 2,000 linear feet of 36-inch diameter sanitary sewer located in the Wisconsin Southern Railroad corridor between Buckeye Road and Cottage Grove Road on Madison’s East Side. In order to maintain continued operations of the sewer line, MMSD will need to install temporary bypass piping which allows for continued flow of wastewater through temporary piping while rehabilitating the existing line; this work does not allow for all construction activities of the project to take place during the normal working hours of 7:00AM and 7:00PM. Construction activities will commence between October 2018 and May 2019 and will take approximately 6 weeks to complete. The construction work is anticipated to extend into the evening hours for 2 nights when the installation of the pipe is underway but if there are unplanned construction delays, additional nights may be required.

Madison General Ordinance section 24.08(3) provides the Common Council the ability to allow construction activities outside of the hours of 7:00 AM to 7:00 PM with the passage of a resolution and a hearing before the Board of Public Works. It is anticipated that the Contractor performing this work will call for permission to perform the work required to continue pumping operations outside the hours of 7:00 AM to 7:00 PM because:

1. The bypassing and installation processes may operate outside of the standard working hours

The proposed activities beyond the hours of 7:00 AM to 7:00 PM may be as follows:

1. Hydraulic cleaning of the sanitary sewer main sections to b...