File #: 50922    Version: 1 Name: Authorizing a non-competitive purchase of services contract with Mead and Hunt for professional architectural and engineering services for the design of (2019 - Phase 1) Metro Bus Barn Facility Upgrades.
Type: Resolution Status: Passed
File created: 3/13/2018 In control: COMMON COUNCIL
On agenda: 4/17/2018 Final action: 4/17/2018
Enactment date: 4/23/2018 Enactment #: RES-18-00311
Title: Resolution authorizing a non-competitive purchase of services contract with Mead and Hunt for professional architectural and engineering services for the design of (2019 - Phase 1) Metro Bus Barn Facility Upgrades. (6th AD)
Sponsors: Marsha A. Rummel
Attachments: 1. Executive Summary.pdf

Fiscal Note

The proposed resolution authorizes a non-competitive purchased services contract with Mead and Hunt for continued work pertaining to the evaluation and improvements of the Metro Transit Bus Barn located on East Washington Avenue. The cost of this agreement is $740,000, which is budgeted within the adopted 2018 capital budget in Metro's Facilities Repairs and Improvements capital program. In 2018, $1.54 million of GO Borrowing is budgeted within the program for these costs.

Title

Resolution authorizing a non-competitive purchase of services contract with Mead and Hunt for professional architectural and engineering services for the design of (2019 - Phase 1) Metro Bus Barn Facility Upgrades.  (6th AD)

Body

WHEREAS the 2018 Capital Budget includes $1,540,000 for Metro Transit Facilities Repairs and Improvement;

 

WHEREAS Mead & Hunt completed a building master plan study for the 1101 E. Washington Ave Metro Transit Bus Barn in March 2018, and is familiar with the project and design requirements; and

 

WHEREAS the building master plan study was awarded in May 2017 after a competitive Request for Proposal (RFP) process; and

 

WHEREAS the building master plan study identified the general cost and scope of work required to complete the Metro Bus Barn Facility Upgrades.

 

WHEREAS, under MGO 4.26(4)(b), if a service contract exceeds $25,000 and the contract was not subject to a competitive selection process, the contract shall meet one of the requirements of sec. 4.26(4)(a) and be approved by the Common Council, and signed by the Mayor and Clerk; and

 

WHEREAS, this contract meets section 4.26(4)(a)7 which provides that a contract may be approved without a competitive selection process if the contractor has performed similar services in the past and it would be economical on the basis of time and money to retain the same firm.

 

NOW, THEREFORE BE IT RESOLVED that the Mayor and City Clerk are hereby authorized to enter into a contract with Mead & Hunt to provide for professional architectural and engineering services for the design of Metro Bus Barn Facility Upgrades; and,

 

BE IT FURTHER RESOLVED that in accordance with MGO section 4.26(4)(a)7 the Common Council finds that the further solicitation of proposals is not required because the contractor has performed similar services in the past and it would be economical on the basis of time and money to retain the same firm.