Madison, WI Header
File #: 47945    Version: 1 Name: Temporary Land Use Permit- Request from Strike USA for temporary access within Door Creek Park to complete pipeline safety integrity inspections for ANR Pipeline company (subsidiary of TransCanada Pipelines).
Type: Communication Status: Approved
File created: 7/6/2017 In control: BOARD OF PARK COMMISSIONERS
On agenda: Final action: 7/12/2017
Enactment date: Enactment #:
Title: Temporary Land Use Permit- Request from Strike USA for temporary access within Door Creek Park to complete pipeline safety integrity inspections for ANR Pipeline company (subsidiary of TransCanada Pipelines).
Attachments: 1. Door Creek Temp Land Use Exhibit A.pdf
Title
Temporary Land Use Permit- Request from Strike USA for temporary access within Door Creek Park to complete pipeline safety integrity inspections for ANR Pipeline company (subsidiary of TransCanada Pipelines).

Body
The City of Madison Parks Division has received a request from Strike USA (“User”) to take access through Door Creek Park to allow them to perform pipeline safety integrity inspections and excavation activities for ANR Pipeline company (subsidiary of TransCanada Pipelines) on the interstate natural gas pipeline located within the existing 75ft wide right of way that traverses the park. The User requests the temporary access through the park under the following terms and conditions:

The City of Madison Parks Division hereby agrees to allow the User and/or his subcontractors temporarily access to a portion of City-owned property located at 6901 Bluff Point Drive, aka, Door Creek Park, as depicted on attached Exhibit A (the “Premises”), for the purpose accessing the existing pipeline and pipeline right of way within the park; including the right of ingress and egress and the right to operate necessary equipment thereon for said construction activities, as set forth in the drawing attached hereto as page 2 of Exhibit A.

This Permit is subject to the following conditions:

The User shall contact Craig Klinke at (608) 698-2550 or cklinke@cityofmadison.com a minimum of 72 hours in advance and prior to the use of the Premises and to review the proposed access routes. Access shall only be allowed upon written or verbal approval by the Madison Parks Division.

Access through the park is only granted between 7am and 4pm, unless otherwise approved by the Parks Superintendent or his designee.

The User shall provide further details on equipment types and specifications on size and weight. If require by the Parks Division, the User shall provide engineering calculations on loading and bridge capacity analysis to determi...

Click here for full text