Madison, WI Header
File #: 42678    Version: 1 Name: Amending the 2016 Capital Budget of Major Streets & Authorizing the Mayor and the City Clerk to execute an agreement with Strand Associates, Inc. for design engineering services for the Blair Street/John Nolen Drive Corridor Study.
Type: Resolution Status: Passed
File created: 4/26/2016 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 5/17/2016 Final action: 5/17/2016
Enactment date: 5/19/2016 Enactment #: RES-16-00361
Title: Amending the 2016 Capital Budget of Major Streets & Authorizing the Mayor and the City Clerk to execute an agreement with Strand Associates, Inc. for design engineering services for the Blair Street/John Nolen Drive Corridor Study.
Sponsors: Michael E. Verveer, Marsha A. Rummel
Fiscal Note
The proposed resolution amends the adopted 2016 capital budget by authorizing an increase in expenditure authority in the amount of $113,000 provided by refunds received from DOT from prior year capital projects. The refunds will be spent in 2016 for the cost of design engineering services on the Blair Street/John Nolen Drive Corridor Study (MUNIS 11275) in combination with $100,000 GO borrowing which is authorized for this capital project in the adopted 2016 capital project.

The proposed resolution authorizes an agreement for the design engineering services at a total estimated cost of $213,000.

MUNIS:
11275-402-170 $213,000

Title
Amending the 2016 Capital Budget of Major Streets & Authorizing the Mayor and the City Clerk to execute an agreement with Strand Associates, Inc. for design engineering services for the Blair Street/John Nolen Drive Corridor Study.
Body
PREAMBLE

The City is proposing to reconstruct Blair Street (State Hwy 151) from E. Washington Avenue to John Nolen Dr. in a future year.

The consultant’s services will include:
Review of previous studies
Topographic Survey
Alternative Development & Operational Intersection Analysis
Cost Estimating
Preliminary Design Plans
Public Information Meetings
Final Report

Alternatives will be analyzed with respect to Pedestrians, Bicyclists, Motor Vehicles and Transit. Final Plans & Specifications are not part of this contract and will be prepared at a later time.

Pursuant to City Ordinances and Policies, the City Engineer advertised for consultant proposals, reviewed the submitted proposals, and recommends the design engineering contract be awarded to Strand Associates, Inc.

This will be a multi-year design project (2016-2017) and construction is scheduled for a future year. $113,470 of the cost will come from the budget amendment that is part of this resolution with the remainder coming from the $100,000 that has been budgeted in 2016 for this study.

NOW THEREFORE BE IT RESOLVED ...

Click here for full text