Title
Nakoma Greenway Repair in Nakoma Park
Body
The drainage channel within Nakoma Park is experiencing erosion in several locations on both banks, as well as in the area upstream of the channel. The City is proposing to regrade and stabilize the portions of bank that are actively eroding, and provide a stabilized pathway for flood waters that enter the channel via overland flow.