Fiscal Note
The projected annualized cost is $4,150 (or $4,750 including benefits).
Title
Recreating a vacant Engineering Program Specialist 1 (#1888, CG16, R17) position at the Water Utility to a Surveyor 2 (CG18, R08).
Body
Resolution that the vacant position (#1888) of Engineering Program Specialist 1 in Compensation Group 16, Range 17 in the permanent salary detail of the Water Utility budget is repealed and recreated as a Surveyor 2 in Compensation Group 18, Range 8 thereof.