Fiscal Note
Costs for 2014 are projected at $3,423, or $3,924 including benefits. Funding will be made available by the management of salary savings. Based upon a comparison of maximums, long term annualized costs are estimated at $7,036, or $8,067 including benefits. Costs will be incorporated into future year operating budgets, as appropriate.
Title
Recreate the 1.0 FTE position of Architect 3, #4309 (occupied by B. Cooper), in CG18-10, as an Architect 4, CG18-12 in the Engineering Division budget. Reallocate the respective incumbent of position #4309 to the new position.
Body
Resolution that the 1.0 FTE position of Architect 3, #4309 (occupied by B. Cooper), in CG18-10, shall be deleted and recreated as an Architect 4, CG18-12 in the permanent salary detail of the Engineering Division budget. The respective incumbent of position #4309 shall be reallocated to the new position.